Krom Schroder VGP10 Operating Instructions Manual Download Page 4

GB-4

D

GB

F

NL

I

E

Replacing the actuator

 

We recommend replacing the entire actuator set 
when replacing the actuator.

 

Actuator set VGP 10-15 comprises the actuator, 

1 x O-ring, 1 x seal and 1 x quick fastener.

 

Actuator set VGP 20-25 comprises the actuator 

and 2 x O-rings.

 

The actuator set is available separately as a 

spare part.

VGP
  

  Disconnect the system from the electrical power 

supply.

 2 

 Shut off the gas supply.

3

4

5

VGP 0-5

11

6

9

10

8

7

 

Do not remove the grounding spring 

A

.

11

6

9

10

8

7

VGP 20-25

10

6

7

8

9

11

VGP

12

13

14

 4 

 The unit is ready for operation.

 5 

 Release the gas supply.

Maintenance

 

In order to ensure smooth operation: check the 
tightness and function of the VGP every year, or 
every six months if operated with biogas. 

Checking tightness and function

 

In order to determine whether the VGP is tight 
and closes securely, check the internal and ex-
ternal tightness, see page 3 (Tightness test).

 

Check electrical installations in line with local reg-
ulations; pay particular attention to the PE wire, 
see page 3 (Wiring).

 

We recommend replacing the entire seal set 
when servicing the solenoid valve.

 

Seal set VGP 10-15 comprises the valve seal, 2 x 
O-rings, 1 x seal and 1 x quick fastener.

 

Seal set VGP 20-25 comprises the valve seal 
and 3 x O-rings.

 

The seal set is available separately as a spare part.

VGP
  

  Disconnect the system from the electrical power 

supply.

 2 

 Shut off the gas supply.

VGP 0-5

3

4

5

 

Do not remove the grounding spring 

A

.

6

7

8

 

Check closing spring for damage.

 

Closing spring damaged: dismantle the unit and 
return it to the manufacturer.

13

12

9

14

10

11

Summary of Contents for VGP10

Page 1: ...WARNING Indicates possible danger to life and limb CAUTION Indicates possible material damage All interventions may only be carried out by qualified gas technicians Electrical interventions may only b...

Page 2: ...D 49018 Osnabr ck Germany VGP Installation CAUTION Please observe the following to ensure that the VGP is not damaged during installation and operation Do not clamp the unit in a vice Only secure the...

Page 3: ...n be rotated 2 1 3 1 N 2 L 4 5 3 6 7 8 Plug insert can be rotated in 90 steps 10 9 12 11 Tightness test CAUTION Please observe the following to ensure that the VGP is not damaged during the tightness...

Page 4: ...year or every six months if operated with biogas Checking tightness and function In order to determine whether the VGP is tight and closes securely check the internal and ex ternal tightness see page...

Page 5: ...observe the following to ensure that the VGP is not damaged during subsequent operation Install the closing spring in the correct position Ensure that the catch of the closing spring is positioned in...

Page 6: ...Note the inscription on the rectifier adapter 1 2 No resistance replace adapter The rectifier adapter is available separately as a spare part Actuator defective Remove socket and rectifier adapter see...

Page 7: ...based on using the product in accordance with these operating instructions Once the designed lifetime has been reached safety relevant products must be replaced Designed lifetime based on date of man...

Page 8: ...equirements of the listed Direc tives and Standards Directives 2009 142 EC GAD valid until 20 April 2018 2014 30 EU 2014 35 EU Regulation EU 2016 426 GAR valid from 21 April 2018 The relevant product...

Reviews: