Krom Schroder VGP10 Operating Instructions Manual Download Page 3

GB-3

D

GB

F

NL

I

E

Wiring

 WARNING

Electric shocks can be fatal! Before working on 
possible live components, ensure the unit is discon-
nected from the power supply.

 

The solenoid actuator heats up during operation 

depending on ambient temperature and voltage.

> +80 °C

 

The rectifier adapter must be installed.

 

Use temperature-resistant cable (> 80°C).

  

  Disconnect the system from the electrical power 

supply.

 2 

 Shut off the gas supply.

 

Wiring to EN 60204-1.

 

The actuator can be rotated.

2

1

3

1 = N
2 = L

4

5

3

6

7

8

 

Plug insert can be rotated in 90° steps.

10

9

12

11

Tightness test

 CAUTION

Please observe the following to ensure that the VGP 
is not damaged during the tightness test:

–   Check max. inlet pressure – see type label.
–   Test pressure ≤ 1.5 x max. inlet pressure.

  

 Close the solenoid valve.

 2 

 To be able to check the tightness, shut off the 

downstream pipeline as close as possible to the 
valve.

0

0

N

2

 

≤ 

1,5 x p

e max

3

 4 

 Open the solenoid valve.

0

N

2

 

≤ 

1,5 x p

e max

5

 6 

 Tightness OK: the unit is ready for operation.

 7 

 Open the pipeline again and release the gas 

supply.

 

VGP leaking: dismantle the unit and return it to 

the manufacturer.

Summary of Contents for VGP10

Page 1: ...WARNING Indicates possible danger to life and limb CAUTION Indicates possible material damage All interventions may only be carried out by qualified gas technicians Electrical interventions may only b...

Page 2: ...D 49018 Osnabr ck Germany VGP Installation CAUTION Please observe the following to ensure that the VGP is not damaged during installation and operation Do not clamp the unit in a vice Only secure the...

Page 3: ...n be rotated 2 1 3 1 N 2 L 4 5 3 6 7 8 Plug insert can be rotated in 90 steps 10 9 12 11 Tightness test CAUTION Please observe the following to ensure that the VGP is not damaged during the tightness...

Page 4: ...year or every six months if operated with biogas Checking tightness and function In order to determine whether the VGP is tight and closes securely check the internal and ex ternal tightness see page...

Page 5: ...observe the following to ensure that the VGP is not damaged during subsequent operation Install the closing spring in the correct position Ensure that the catch of the closing spring is positioned in...

Page 6: ...Note the inscription on the rectifier adapter 1 2 No resistance replace adapter The rectifier adapter is available separately as a spare part Actuator defective Remove socket and rectifier adapter see...

Page 7: ...based on using the product in accordance with these operating instructions Once the designed lifetime has been reached safety relevant products must be replaced Designed lifetime based on date of man...

Page 8: ...equirements of the listed Direc tives and Standards Directives 2009 142 EC GAD valid until 20 April 2018 2014 30 EU 2014 35 EU Regulation EU 2016 426 GAR valid from 21 April 2018 The relevant product...

Reviews: