![Kroll Kozy MTM52 Manual Download Page 4](http://html1.mh-extra.com/html/kroll/kozy-mtm52/kozy-mtm52_manual_2004469004.webp)
6.
Installation
•
read the local Healty and Safety and fire protection regulations,
•
place the heater on a flat, concrete floor, in the spot allowing free space around the device, according
to Fig. 2.,
•
level the device - in order to check whether the heater is well levelled, place the furnace bowl in the lower part
of the combustion chamber and pour a small amount of diesel oil into it - the oil should spill out exactly in the
middle of the bowl,
•
install the draught regulator on the pipe exiting the combustion chamber to ensure stable draught inside the
chamber during heater operation,
•
to provide optimal draught, install an at least 5-metre-long smooth, vertical stack pipe resistant to high
temperature (not aluminium),
•
check the leak tightness of all stack connections sealing with suitable material if necessary,
•
make sure that the combustion bowl is located in the combustion chamber centrally,
•
place the deflector inside the combustion chamber according to Fig. 3.,
•
check the network voltage (240V/50Hz) and connect the heater to the power supply. Neither the fan nor the pump
should start because the heater is not switched on yet and no heat has been produced.
Fig. 2. Minimal safety space around the device.
Fig. 3. Combustion chamber structure