Installation and operating instructions
9 ALTOSONIC
III
2.5
Pipe flanges
Refer to dimensional drawings for flange spacing and in addition allow for
thickness of gaskets. Install flowmeter in line with pipe axis. Pipe flange
faces must be parallel to each other, max.
Permissible deviation: Lmax - Lmin
≤
0.5 mm (0.02").
2.6
Pipes with cathodic
protection
Pipes with electric corrosion protection
are generally insulated inside and
outside so that the fluid has no
conductive connection to ground. The
flowmeter must be insulated from the
pipe. Note the following when installing
the flowmeter:
The pipe flanges must be connected to
each other using a copper cable (L), but
must not be connected to the flowmeter.
The bolts for the flange connections and
the gaskets must be insulated. Use
sleeves and washers that are made of
insulating material (these must be
provided by customer).
1. Flange of flow sensor
2. Pipe flange
3. Gasket
4. Bolt
5. Nut
6. Washer
7. Insulating sleeve
Follow grounding instructions.
Use
≥
4 mm² (
≥
AWG 11 cable).
Note: No earthing cables are supplied by KROHNE.
Summary of Contents for Altosonic III
Page 31: ...Installation and operating instructions 31 ALTOSONIC III ...
Page 32: ...ALTOSONIC III 32 ...
Page 36: ...ALTOSONIC III 36 Appendix 1 EC Type examination certificate ...
Page 37: ...Installation and operating instructions 37 ALTOSONIC III ...
Page 38: ...ALTOSONIC III 38 ...
Page 39: ...Installation and operating instructions 39 ALTOSONIC III ...
Page 40: ...ALTOSONIC III 40 ...
Page 41: ...Installation and operating instructions 41 ALTOSONIC III Appendix 2 Declaration of conformity ...
Page 42: ...ALTOSONIC III 42 Appendix 3 Type plates ...
Page 43: ...Installation and operating instructions 43 ALTOSONIC III Notes ...