__________________________________________________________________________________________
Kreyer – Picture guide to installation and start-up MCK and Chilly Max (page 7 of 18) v.07-2015
Step 7: Take the key, open the cover panels. Connect the chiller on the water-side of your installation
(we strongly recommend to install an additional strainer/filter in the inlet pipe connected to your
chiller).
Step 8: Take off the cover of the buffer tank.
Step 9: Fill in the water (observe the water quality as described in the instruction manual) and check
the water level in the sight glass.