__________________________________________________________________________________________
Kreyer – Picture guide to installation and start-up MCK and Chilly Max (page 6 of 18) v.07-2015
Check the wiring diagram of the chiller appearing at the end of the instruction manual where to
connect the cable of the solenoid valve (in this example here the contact inside the control cabinet is
X2 -> clips 5, 6 and 7=earth). It doesn’t matter whether you connect the brown or the blue cable to
clip 5 or 6:
- End of the optional overflow protection kit -