![KRAUSE ClimTec Installation And User Manual Download Page 33](http://html1.mh-extra.com/html/krause/climtec/climtec_installation-and-user-manual_2002984033.webp)
Basic scaffold with first extension
Note:
Free-standing scaffolds must be secured against tilting with ballasts, outriggers
and stabilizing sets. For details regarding the number of required ballasts and
outriggers, refer to the table on page 71.
The picture shows a ballast element
on the stabilizer.
For details, see page 71
The picture shows an attached
outrigger.
For details, see page 71
The picture shows how to adjust a
stabilizing set.
For details, see page 72
61
62
x5
x18
x2
1
7 6
2
4
3
5
8
4.4 Basic scaffold with first and second Extension
To assemble a scaffold with two frame elements, you need a basic scaffold (prod.
no. 710116 / 600004), the parts of the 1
st
extension (prod. no. 710130 / 600011)
and the parts of the 2
nd
extension. The pack of the 2
nd
extension element (prod. no.
710154 / 600028) consists of the following parts:
Item
Description
Prod. no.
Quantity
1
Vertical frame 2.00 x 0.65 m
715012
2
2
Set of stabilisers
714305
1
3
Platform with hatch 1.50 x 0.60 m
711007
1
4
Diagonal brace 1.89 m
712707
4
5
Rail brace 1.59 m
712806
4
6
Safety set for rail brace/diagonal brace M5 x 65 mm
718860
18
7
Safety set for platform M5 x 85 mm
718877
2
8
Gravity pin
714411
5
Basic scaffold with first and second extension
Summary of Contents for ClimTec
Page 1: ...ClimTec System Alu ca 5 00 m ca 3 00 m ca 7 00 m 1 2 0 EXTRAS www krause systems com EN 1004...
Page 83: ...162 161 M5x65 M5x85 M 5 x 65 M 5 x 85 4 4 1 2 3 4 2 4 3 4 4 4 5 4 6 4 7 4 8 4 5 4 6 4 7...
Page 85: ...166 165 1 8 50 350 2 M 5 x 65 M 5 x 65 3...
Page 87: ...170 169 1 718891 350 2 M 5 x 65 4 2 0 0 65 3...
Page 88: ...172 171 6 5 1 0 x 0 65 7 8 2 8...
Page 89: ...174 173 9 8...
Page 91: ...178 177 1 350 2 183 M 5 x 65 3 4 2 0 0 65...
Page 92: ...180 179 5 6 8 1 0 x 0 65 7...
Page 93: ...182 181 9 10 12 20 11...
Page 94: ...184 183 185 185 185 186 4 5 4 6 22 25 75 Wortabstand...