11
Manual
www.kraun.it
3. screw the two m4 screws described as fig 10 ( symmetrical on both sides, a total of four).
fig 13 cabinet installation bracket assembly
4.5.3. tower/rack assembly
fig 14 Tower-mounted assembly fig 15 Rack-mounted assembly
warning:
•
Before installing battery, make sure that UPS and breaker are all turned off. Remove all your metallic adorn-
ment such as finger ring, watch, and so on before connecting battery.
•
no anti-connection or short circuit between the battery anode and cathode forever. Red cable connect
with battery anode “+” and black cable connect with cathode “-”.
•
Please use the screwdriver with insulating handle. Do no lay the tools or metallic goods on the battery.
notice:
•
when connecting load to UPS, first turn off load and then connect the power cable and finally turn on load
one-by-one.
•
Inductance loads such as motor, fluorescent lamp, copy cat are strictly prohibited connecting to UPS to
avoid damage.
•
Plug UPS on the special socket with over-current protection, the power socket that used should be con-
nected with ground wire.