background image

Installing on a Rack 

 

5

5  Installing on a Rack 

This section describes what to do before installing on a rack and how to rack 

mount. 

 

Before Installing on a Rack 

Before installing on a rack, be sure that the environment is 

within the recommended range: 
Operating temperature range  +5 to +45 Deg. Centigrade 
Operating humidity range 

5 to 65 % RHL, non-condensing 

Storage temperature range 

-20 to +70 Deg. Centigrade 

Storage humidity range 

5 to 95% RHL, non-condensing 

 

 CAUTION!! 

When installing on a 19" rack, avoid hazards by taking 

care that: 
 
1

 

It is located within the recommended environmental 

conditions, as the operating ambient temperature of a 

closed or multi unit rack assembly may exceed the room 

ambient temperature. 

2

 

Once rack mounted, enough air will still flow around the 

machine. 

3

 

The machine is placed straight in the correct horizontal 

position. 

4

 

You do not overload the circuit(s). When connecting the 

machine to the supply circuit, overloading the circuits 

might have a detrimental effect on overcurrent 

protection and supply wiring. Refer to the appropriate 

nameplate ratings for information. For example, for fuse 

replacement, see the value printed on the product label. 

5

 

The machine is earthed (grounded) in a reliable way and 

is connected only to an electricity socket with grounding. 

Pay particular attention to supply connections other than 

direct connections to the branch circuit (for example, the 

use of power strips), and that you use only the power cord 

that is supplied with the machine.

 

 

 

 

 

 

 

 

 

 

 

How to Rack Mount 

To rack-mount the machine: 
1

 

Attach both ear brackets to the 

machine. To do so, remove the 

screws from each side of the 

machine (3 on each side), and 

replace those screws through 

the ear brackets. 

 

2

 

Place the ears of the machine 

against the rack rails, and insert 

the proper screws (not provided) 

through each of the four holes in 

the rack ears. 

Note that: 

 In some models, the front panel 

may feature built-in rack ears 

 Detachable rack ears can be 

removed for desktop use 

 Always mount the machine in the 

rack before you attach any cables or 

connect the machine to the power 

 If you are using a Kramer rack 

adapter kit (for a machine that is not 

19"), see the Rack Adapters user 

manual for installation instructions 

(you can download it at: 

http://www.kramerelectronics.com) 

 

Summary of Contents for FC-4001

Page 1: ...Kramer Electronics Ltd USER MANUAL Model FC 4001 Format Converter TBC...

Page 2: ...rter TBC 3 Figure 2 Connecting a PC without using a Null modem Adapter 7 Figure 3 Connecting the FC 4001 Format Converter TBC 8 Tables Table 1 Front Panel FC 4001 Format Converter TBC 4 Table 2 Rear P...

Page 3: ...ou Unpack the equipment carefully and save the original box and packaging materials for possible future shipment Review the contents of this user manual Use Kramer high performance high resolution cab...

Page 4: ...anel buttons for input selection CV Y C YUV RGB S and SDI Genlock freeze and panel lock Coarse trimmers and fine trimmers for adjusting the sync phase and the horizontal to subcarrier phase SCH Contro...

Page 5: ...Your FC 4001 Format Converter TBC 3 Figure 1 FC 4001 Format Converter TBC...

Page 6: ...o source 18 Y C 4p Connector Connects to the s Video Y C source 19 G Y BNC Connector 20 R R Y BNC Connector 21 B B Y BNC Connector 22 SYNC BNC Connector Connects to the RGB connect all 3 connectors R...

Page 7: ...Refer to the appropriate nameplate ratings for information For example for fuse replacement see the value printed on the product label 5 The machine is earthed grounded in a reliable way and is connec...

Page 8: ...rs to the FC 4001 the Two SDI OUTPUT BNC connectors to two serial digital video acceptors for example two displays SDI Display 1 and SDI Display 2 Four BNC OUTPUT connectors CV R R Y G Y and C B B Y a...

Page 9: ...our PC to the RS 232 DB9 rear panel port on the FC 4001 unit as Figure 2 illustrates Figure 2 Connecting a PC without using a Null modem Adapter 6 2 Dipswitch Settings The FC 4001 dipswitch settings a...

Page 10: ...IP 5 Dipswitch Set as follows 4 AGC ON for enabling automatic gain control OFF for disabling automatic gain control 5 75 Bar Generator ON for enabling 75 Bar Generator OFF for disabling 75 Bar Generat...

Page 11: ...A LUMA DELAY 1ns CONTROLS Front panel and RS 232 SCH phase SYNC phase H shift freeze panel lock POWER SOURCE 100 240VAC 50 60Hz 14VA DIMENSIONS 19 inch W 7 inch D 1U H rack mountable WEIGHT 2 6 kg 5 7...

Page 12: ...the machine or 1 when sending from the machine to the PC Table 8 Instruction Set INSTRUCTION I5 I4 I3 I2 I1 I0 0 Reset 0 0 0 0 0 0 16 Error 0 1 0 0 0 0 32 Read front panel switch data 1 0 0 0 0 0 33...

Page 13: ...version number before the decimal point and EXTENDED DATA is the value following the decimal point For example for version 3 4 the machine replies with DATA 03 hex and EXTENDED DATA 04 hex FRONT PANEL...

Page 14: ...is required the original dated invoice or a copy must be presented as proof of warranty coverage and should be included in any shipment of the product Please also include in any mailing a contact name...

Page 15: ...or the latest information on our products and a list of Kramer distributors visit our Web site www kramerelectronics com where updates to this user manual may be found We welcome your questions commen...

Reviews: