![KRAL OME 13 Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/kral/ome-13/ome-13_operating-instructions-manual_2000353022.webp)
22
OIO 15en Edition 2020-05
Operating Instructions
Installation
Installation, removal and connection
Preferred installation variant
Recommendations for alternative installation variants
Flow vertically from bottom to top
► Preferred installation variant.
Flow vertically from top to bottom
► Ensure that the liquid does not flow freely out
of the flowmeter, for example by routing the
piping upwards.
No vertical installation with open outlet
► Measuring error through free flowing of the
liquid out of the flowmeter.
Horizontal flow
► Ensure that the liquid does not flow freely out
of the flowmeter, for example by routing the
piping upwards.
No horizontal installation at the highest
point in the pipe system
► Avoid measuring error through formation of
an air pocket in the flowmeter.
No air bubbles in the pipe system
► Measuring error through air bubbles in the
pipe system. Vent the complete pipe system
thoroughly during commissioning.
9
X
9
X
X
X
X