![KOREL M2OC-18HFN8-Q Service Manual Download Page 25](http://html1.mh-extra.com/html/korel/m2oc-18hfn8-q/m2oc-18hfn8-q_service-manual_1997705025.webp)
24
8.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-
way valve’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Summary of Contents for M2OC-18HFN8-Q
Page 8: ...7 5 Wiring diagram M2OC 18HFN8 Q M2OG 14HFN8 Q...
Page 9: ...8 M2OD 18HFN8 Q...
Page 11: ...10 M3OE 27HFN8 Q...
Page 12: ...11 M3OF 21HFN8 Q M3OF 27HFN8 Q M4OE 28HFN8 Q...
Page 13: ...12 M4OB 36HFN8 Q...
Page 14: ...13 M5OD 42HFN8 Q...