PLUMBING GUIDELINES
1. Make sure cooler is upright for at least an hour before installation. Ensure all pieces of
the cooler are attached properly.
2. Plug cooler into electrical outlet.
3. Make sure hot tank switch is in the OFF position.
4. Attach the 1/4” water line to the inlet port of the cooler.
5. Turn water on and wait 5 minutes to allow tanks to fill.
6. Once tanks have filled, test each faucet to ensure steady stream.
7. Turn on hot switch.
8. Check for leaks on all connections.
Kool Tek G8 Hot and Cold Water Cooler Manual
3