background image

TECHNICAL DATA

KÖNIG & MEYER

GmbH & Co. KG 

Kiesweg 2, 97877 Wertheim, www.k-m.de
24624-000-55/76  Rev.09/Rev.01  03-80-834-00  12/18

Material

Plate, Feet, Tubes: Steel, black powder coated
Threads: Steel, galvanized
Brackets: Zinc die-cast, black powder coated
Cable protection: PA-6, black
Handle: TPE, black

Load

max 18 kg centered

Dimensions

W x D x H:  550 x 550 x 2400 mm

Box

Base: 670 x 670 x 35 mm
Tube combination: 1400 x 115 x 5 0mm

Weight

18 kg

Accessories
(optional)

Crossbars 21390, 21393
Carrier bag for base plate 24627

CHECK, MAINTENANCE, CLEANING

- Careful use of the stand maintains the use of the extension tube and the load bearing 

-

functionality of the stand as well as the safety of the installation.

- Perform maintenance only without the lighting attached and watch for possible risks

-

(pinched fingers, impact, the stand falls over).

- To care for the product use a damp cloth and

-

a non-abrasive cleaning agent.

MOUNTING LIGHT(S) TO THE STAND

ATTENTION! 
Do not underestimate the weight of the lights

12

placement and extension of the lights must be 

10

carried out by physically fit technicians.

10

Firmly grasp the tubes and secure with 

10

the locking pin.

MOVING THE LIGHT STAND (LOAD)
Technicians:

FP - First Person:
operates the distance rod 
with the weight

SP - Second Person:
operates the clamping bracket's
clamping screw and locking pin

Order when extending the stand:

FP 

13

holds the extension tube

SP 

14

loosens the clamp screw

12

and holds it

15

pulls the locking pin until 

13

the locking pin is no longer

13

in the locked position

FP 

16

extends the extension tube and 

14

lighting to the desired approx. height;

14

NOTE:

14

to find the pin hole easily

14

the locking pin

14

should be placed

14

just above the hole  

SP

17

let go of the locking knob,

15

so that the pin can click into

15

the extension tube

FP

18

slowly lowers the extension tube

16

until the locking pin locks

SP

19

tightens the clamping screw

17

(manual strength is enough)

When retracting the weight 
the reverse order applies
IMPORTANT: Ensure that one 
person immediately tightens the 
locking pin 

17 

if a second person

cannot securely hold the  
extension tube.

FAULT-FINDING (F) and REPAIR (R)

F: The base plate rocks back and forth on the floor:

F:

R: Check if the surface is even 

F:

R: Base plate feet 

9

are loose?, tighten with a socket wrench (SW8 = M5)

F: The tube combination is not sturdy i.e. is leaning to one side:        

F:

R: Check to ensure that the M-20 bolt is tight, Securely screw in the

F: R:

tube combination 

3

F:

R: Counter nuts 

4

are loose? Tighten with Allen wrench (SW40)

F:

R: Check to ensure that the tube combination is straight

F:

R: Ensure that the surface this even

F: The tube combination is facing in the wrong direction: 

F:

R: Loosen the counter nut 

4

, Place the tube combination in the desired 

F: B:

direction 

6

and secure the position by tightening the counter nut 

7

USAGE NOTES / FUNCTION

Application examples (not included delivery)

Reviews: