16 OPERATION MANUAL
OPERATING PROCEDURES
Follow these procedures when an electrical power
failure while film is being processed in the SRX-101A.
q
Wait until the power is restored.
w
After the power is restored, press the RUN button ON.
●
The film that was being processed will be ejected
from the processor.
If the power failure occurred when the film was
in the developer tank, the film may be damaged
if the power is not restored shortly.
e
Wait until the READY lamp goes on to resume film
processing.
If SRX-101A will be out of use for a long period
(a week or longer), follow the procedures below.
q
Open all the drainage valves and empty all of
three tanks.
w
Remove the DEV and FIX/WASH racks. Scrub
them (including their rollers) with a sponge and
warm water (under 104
<
).
After rinsing, leave them to dry.
e
Fill the processing tanks water and switch the SRX-
101A ON to circulate it through the system.
Make sure that the tanks and hoses have been
thoroughly rinsed, then drain the water from the tanks.
r
Set the dried racks back into their respective tanks.
t
Store the SRX-101A in a dry (low humidity) place.
The following table is a listing of the values preset at
the factory to control the SRX-101A's operating
conditions. If you need to change any of these
conditions, please contact your nearest authorized
KONICA dealer.
(1)There are three process cycle to choose from:
90 seconds, 120 seconds and 180 seconds.
If you choose the 90 second cycle, use KONICA's
recommended SR film and SR chemical.
If it is not available for you, please contact the
authorized Konica dealer.
(2)DEV temperature may be set between 84
<
and
99
<
.
This value may be adjusted according to room
condition.
(3)There are three standby options to choose from:
10 minutes, 30 minutes, continuous operation.
The SRX-101A will switch over to standby if no
film has been inserted for 5 minutes while the
READY lamp is ON. During standby the heater
will go ON and OFF at 5 minute intervals.
As soon as a sheet of film is inserted, the SRX-
101A will automatically switch over to normal
operating conditions.
Responding to Power Failure
6
NOTE:
Maintenance When Long Periods
of No Operation
7
Changing Processing
Conditions
8
Condition
Preset Value
Process cycle
(1)
120 seconds
DEV temperature
(2)
93
<
Replenish amounts
DEV
40
P
/10"x12" sheet
FIX
70
P
/10"x12" sheet
Standby interval
(3)
10 minutes
Power source frequency
60Hz