1-20
bizhub 758/PRO 958
Space requirements
1
1.6
NOTICE
Be sure to allow a clearance of 3-15/16 inches (100 mm) or more at the back of this machine for the ventilation
duct.
bizhub 758/PRO 958 + FS-536 SD + RU-515 + LU-303
81-9/16 (2071)
26 (660)
39-3/4 (1010)
15-13/16
(401)
Unit: inch (mm)
55-7/8 (1419)
62-7/16 (15
85.5)
48-1/2 (12
32)
13-
15/
16
(353.
5)
19-5/8
(498)
36-1/4 (921)
bizhub 758/PRO 958 + MK-715
35-1/4 (895)
11-5/8
(295)
46-7/8 (1190)
Unit: inch (mm)
55-7/8 (1419)
62-7/16
(1585.
5)
48-1/2 (1232)
13-
15/
16
(353.
5)
19-5/8
(498)
36-1/4 (921)
Summary of Contents for bizhub 758
Page 1: ...bizhub 758 PRO 958 QUICK GUIDE ...
Page 2: ... ...
Page 8: ...Contents 6 bizhub 758 PRO 958 ...
Page 9: ...1 Introduction ...
Page 10: ......
Page 36: ...1 28 bizhub 758 PRO 958 i Option LK 105 v4 searchable PDFs End User License Agreement 1 1 11 ...
Page 37: ...2 About This Machine ...
Page 38: ......
Page 51: ...bizhub 758 PRO 958 2 15 2 3 About this machine 2 Job Separator JS 602 No Name 1 Output Tray ...
Page 55: ...bizhub 758 PRO 958 2 19 2 3 About this machine 2 Large Capacity Unit LU 303 LU 205 ...
Page 81: ...3 Basic Settings and Operations ...
Page 82: ......
Page 115: ...bizhub 758 PRO 958 3 35 3 2 Scan to Send function 3 5 Press the Start key ...
Page 158: ...3 78 bizhub 758 PRO 958 Using the Quick Security function 3 3 8 ...
Page 159: ...4 Advanced Functions ...
Page 160: ......
Page 179: ...5 Troubleshooting ...
Page 180: ......
Page 199: ...6 Index ...
Page 200: ......
Page 202: ...6 4 bizhub 758 PRO 958 6 ...