Chapter 5 Disassembly and Assembly
5-91
Main Unit Side (Locking Pin Unit Assembly)
Work outline
Listed below are the number of people and the rough standard of work hours required for performing the
works described in this section.
Requirements
The works in this section can be performed using only the standard tools.
1
Removal Procedures (Page 5-6)"
"5.2.3 Removing/Installing the Exterior Panel and
to remove the first front panel.
2
Remove the electric component mount panel.
•
8 hex/Phillips-head screws (M4 x 8)
Loosen all screws.
3
Remove all connectors from the PCU.
•
CN1 (PCN1: cable)
•
CN2 (PCN2: cable)
•
CN3 (PCN3: cable)
4
Remove the interlock switch cable connector
(JJ10).
5
Remove the locking pin unit assembly.
•
2 hex/Phillips-head screws (M4 x 8)
Personnel
Number
Work Hours (steps 2 to 11)
1
First Front Side
JJ10
CN3
CN1
CN2
Caution
When removing the connector, hold a notch
on the connector without pulling a cable.
Giving a strong pull to the cable may cause
it to be broken.
First Front Side
Summary of Contents for 0902
Page 2: ......
Page 6: ......
Page 12: ......
Page 30: ...2 10...
Page 54: ......
Page 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Page 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Page 120: ......
Page 296: ...8 10...
Page 300: ......
Page 301: ......