3
Connect the RS-232 ground wire 2 from cPAP to the RS-232 ground from APOS.
Pre-deployment checks
Procedure
1
Make sure the interface cable is properly fastened and that a dummy plug is installed on the
unused bulkhead connector.
2
Push the pressure relief valve in to confirm that it is flush with the end cap.
3
Perform a communication check with APOS before launching.
4
Make sure there will be a free line of sight between the transceiver’s transducer and the seabed
transponders.
Lubricating SubConn
®
connectors
Procedure
1
Grease the connector with Molykote 44 Medium or equivalent grease.
A layer of grease corresponding to minimum 1/10 of the socket depth should be applied to the
female connector.
2
Check that the inner edge of all sockets is completely covered, and a thin transparent layer of
grease is visible on the face of the connector.
3
Fully mate the male and female connector in order to secure optimal distribution of grease on
pins and in sockets.
4
Open and check for grease on every male pin, to confirm that enough grease is applied.
Add more if necessary.
5
Connect and tighten the locking sleeve.
Support information
Should you need technical support for your cPAP MKII you must contact a Kongsberg Maritime
office. A list of all our offices is provided on our website. You can also contact our main support
office in Norway.
Manuals and technical information can be downloaded from our support website.
Company name
Kongsberg Maritime AS
Address
Strandpromenaden 50, 3183 Horten, Norway
Telephone
+47 33 03 41 00
Telephone 24h support
+47 33 03 24 07
Telefax
+47 33 04 76 19
Website
https://www.kongsberg.com/maritime/
Support website
E-mail address
451992 / A / 2019–11–08