General supply conditions
General supply conditions apply to this cNODE delivery.
Receipt, unpacking and storage
Upon accepting shipment of the equipment, the shipyard and/or the dealer must ensure
that the delivery is complete and inspect each shipping container for evidence of physical
damage.
If the inspection reveals any indication of crushing, dropping, immersion in water or
any other form of damage, the recipient should request that a representative from the
company used to transport the equipment be present during unpacking.
All equipment must be inspected for physical damage, i.e. broken controls and indicators,
dents, scratches etc. during unpacking. If any damage to the equipment is discovered, the
recipient must notify both the transportation company and Kongsberg Maritime so that
Kongsberg Maritime can arrange for replacement or repair of the damaged equipment.
Once unpacked, the equipment must be stored in a controlled environment with an
atmosphere free of corrosive agents, excessive humidity or temperature extremes.
The equipment must be covered to protect it from dust and other forms of contamination
when stored.
Equipment responsibility
Unless otherwise stated in the contract, the shipyard doing the installation and/or
equipment dealer becomes fully responsible for the equipment upon receipt.
The duration of responsibility cover:
• The period of time the equipment is stored locally before installation
• The entire installation process
• Commissioning
• The period of time between commissioning and the final acceptance of the equipment
by the end user or owner
Unless other arrangements have been made in the contract, the Kongsberg cNODE
warranty period (as specified in the contract) begins when the acceptance documents
have been signed.
Kongsberg cNODE Instruction Manual
Summary of Contents for cNODE Maxi
Page 1: ...Instruction Manual cNODE Maxi and Midi Transponders Medium Frequency 4000 metres ...
Page 2: ......
Page 69: ...322217 G 67 Differential inclinometer arrangement drawing About drawings ...
Page 70: ...68 322217 G Current meter arrangement drawing Kongsberg cNODE Instruction Manual ...
Page 98: ... 2019 Kongsberg Maritime ...