| Operating Instructions
IRL
Operating Instructions|
IRL
. Putting into operation
When the assembly of the natural water fountain is finished and
a suitable place for the natural-stone fountain was selected ...
Insert the plug of the connecting cable A in the plug of the
connecting cable C.
Insert the plug of the connecting cable B in the transformer.
Insert the mains plug of the transformer into a socket. The
natural-stone fountain is ready for operation.
Switch the “ON/OFF” switch A to “ON” to start the water pump
and the mist generator. The LED indicators at the “ON/OFF“
switch A and on the top of the mist generator lighten red.
If you wish to switch on the mist generators only, switch the
“ON/OFF” switch A to “M”. The LED indicators at the “ON/OFF”
switch A and on the top of the mist generator lighten red.
Turn on the halogen lamp and the rotating colour disc inside
the round plastic base in the centre of the water basin by
pressing the “ON/OFF” switch B.
If you wish to switch on only the halogen lamp and the rotating
colour disc without the water pump and the mist generator
being in operation, switch the “ON/OFF” switch A to “OFF”.
C
A
B
Transformer
, ,
Summary of Contents for E-4038
Page 20: ...Bedienungsanleitung D...
Page 60: ...Bedieningshandleiding NL...
Page 80: ...Operating Instructions IRL...
Page 100: ...Instrukcja obs ugi PL...