background image

UAB KOMFOVENT we reserve the right to make changes without prior notice

V_20-09

25

8. TECHNICAL INFORMATION

Unit

Hot water

Electric

Fans 

input 

power

Ducts

Height

Opera-

ting 

current

Supply 

voltage

Heater  

capacity

Opera-

ting 

current

Supply 

voltage

Heater  

capacity

A

V

kW

1

A

V

kW

W

mm

kg

VERSO R

1000 UH/H 

3,3

1~230

5,7

7,3

3~400

3

2*180

Ø 315

196

1000 UV/V 

3,3

1~230

5,7

7,3

3~400

3

2*180

Ø 315

196

1300 UH/H 

5,5

1~230

9,8

11,7

3~400

4,5

2*270

Ø 315

203

1300 UV/V 

5,5

1~230

9,8

11,7

3~400

4,5

2*270

Ø 315

203

1300 F

6,7

1~230

8

2

10,7

3~400

3

2*370

Ø 315

144

1500 UH/H 

6,7

1~230

10,9

12,9

3~400

4,5

2*450

Ø 315

206

1500 UV/V 

6,7

1~230

10,9

12,9

3~400

4,5

2*450

Ø 315

206

1700 UH/H 

6,7

1~230

13,1

12,9

3~400

4,5

2*470

400x300

220

1700 UV/V 

6,7

1~230

13,1

12,9

3~400

4,5

2*470

400x300

220

2000 UH/H 

6,3

1~230

15,9

16,9

3~400

7,5

2*650

400*300

210

2000 UV/V 

6,3

1~230

15,9

16,9

3~400

7,5

2*650

400*300

210

2000 F

6,3

1~230

10,5

2

16,8

3~400

7,5

2*670

Ø 355

280

2500 H 

11,7

1~230

13,2

2

22

3~400

7,5

2*520

700*300

289

3000 UH/H 

7,1

3~400

26

19,8

3~400

9

2*850

500*400

456

3000 UV/V 

7,1

3~400

26

19,8

3~400

9

2*850

500*400

456

3000 F

7,1

3~400

16,1

2

19,9

3~400

9

2*720

500*400

289

4000 UH/H 

9,7

3~400

26,3

31,1

3~400

15

2*1830

500*400

470

4000 UV/V 

9,7

3~400

26,3

31,1

3~400

15

2*1830

500*400

470

5000 V

8,1

3~400

40

29,5

3~400

15

2*1215

300*1100

600

5000 H

13,1

3~400

20,1

-

-

-

2*1000

1000*500

442

7000 H

18,1

3~400

34,9

-

-

-

2*1340

1200*600

765

VERSO CF

1000 UH/H

3,3

1~230

8,7

9,5

3~400

4,5

2*178

Ø 315

269

1000 UV/V

3,3

1~230

8,7

9,5

3~400

4,5

2*178

Ø 315

269

1000 F

3,3

1~230

5,2

7,3

3~400

3

2*168

Ø 315

173

1300 UH/H

5,5

1~230

10,7

11,7

3~400

4,5

2*370

Ø 315

225

1300 UV/V

5,5

1~230

10,7

11,7

3~400

4,5

2*370

Ø 315

225

1300 F

5,5

1~230

7,1

11,7

3~400

4,5

2*360

Ø 315

175

1500 F

6,7

1~230

7,6

12,9

3~400

4,5

2*460

Ø 315

190

1700 UH/H

6,7

1~230

11,7

12,9

3~400

4,5

2*465

Ø 315

243

1700 UV/V

6,7

1~230

11,7

12,9

3~400

4,5

2*465

Ø 315

243

2300 UH/H

6,3

1~230

13

16,8

3~400

7,5

2*660

400x300

250

2300 UV/V

6,3

1~230

13

16,8

3~400

7,5

2*660

400x300 

250

2500 F

6,3

1~230

13,6

16,9

3~400

7,5

2*640

700x300

340

3500 UH/H

6,3

3~400

18,7

23,4

3~400

12

2*960

500x400

500

3500 UV/V

6,3

3~400

18,7

23,4

3~400

12

2*960

500x400

500

VERSO S

1300 F

3

1~230

6,5

15,7 / 24,4

3~400

9 / 15

350

Ø 250

46

2100 F

3,3

1~230

11,7

24,7 / 35,6

3~400

15 / 22,5

340

700x200

73

3000 F

3,8

3~400

35,9

-

-

-

629

600x400

130

Parameters of hot water 60–40 °C.

Water duct air heater (DH). Order extra.

Summary of Contents for VERSO CF 1000 UH

Page 1: ...VERSO Standard Units EN Installation and Maintenance Service Manual ...

Page 2: ......

Page 3: ...sources For more information about where you can drop off your waste equipment for recycling please contact your local city office waste authority approved WEEE scheme or your household waste disposal service Content 1 SAFETY REQUIREMENTS 4 2 TRANSPORTATION 5 3 BRIEF DESCRIPTION OF THE UNIT 7 3 1 Horizontal units 8 3 2 Vertical units 11 3 3 Flat units 15 4 INSTALLATION 17 4 1 Maintenance space req...

Page 4: ... of electric safety Before starting any operations inside the unit make sure that the unit is switched off and the power cable is unplugged Earth must be installed according EN61557 BS 7671 The unit should be installed according to Installation and Main tenance Manual Before starting the unit check correct position of air filters Service maintenance should be carried out only in conformity with th...

Page 5: ... on timber pal lets The unit is fastened to the pallet with polypropylene packing tape over protective corners Vertical and horizontal units ready for transit and storage 1 Picture When unit is loaded or unloaded by crane cargo rope is fastened in its designated places Forklift truck or hand pallet truck can transport air handling unit as it is shown 2 a b c Pictures Vertical and horizontal unit t...

Page 6: ... unloading from carrier or for subsequent damage on site If outdoor mounted ventilation unit will be stopped in cold tem peratures it is needed to install additional air closing dampers in the supply and extract ducts room side It must not allow the warm air from the premises circulate inside of the unit when it is stopped otherwise condensate may appear and could damage electronic components If v...

Page 7: ... outside the air handling unit Continuous operation of the equipment will significantly reduce the risk of condensation To maintain a good indoor climate comply with regulations and to avoid condensation damage the unit must never be stopped apart from during service maintenance or in connection with an accident If the unit is placed in spaces with high humidity condensation might occur on the sur...

Page 8: ...H 2000 UH Right inspection side R1 Left inspection side L1 A D C B 2 3 11 4 10 6 7 12 5 A D C B 2 3 11 4 10 6 7 12 5 VERSO R 2500 H Right inspection side R1 Left inspection side L1 6 11 7 10 3 2 12 4 5 6 11 7 10 3 2 12 4 5 A D C B A D C B Right inspection side R2 Left inspection side L2 6 11 7 10 3 2 12 4 5 6 11 7 10 3 2 12 4 5 A D C B A D C B ...

Page 9: ...11 10 6 7 12 4 5 2 3 11 10 6 7 12 4 5 VERSO R 5000 H Right inspection side R1 Left inspection side L1 6 11 7 10 3 2 12 5 6 11 7 10 3 2 12 5 A D C B A D C B Right inspection side R2 Left inspection side L2 6 11 7 10 3 2 12 5 6 11 7 10 3 2 12 5 A D C B A D C B VERSO R 7000 UH Right inspection side R1 Left inspection side L1 A B C D A B C D 3 6 2 12 11 10 5 7 3 6 2 12 11 10 5 7 ...

Page 10: ...11 7 5 4 12 3 8 9 6 8 1 2 11 7 5 4 VERSO CF 3500 UH Right inspection side R1 Left inspection side L1 A D C B C B A D 3 4 8 12 6 8 9 2 11 7 5 1 3 4 8 12 6 8 9 2 11 7 5 1 A outdoor intake air B air supplied to the premises C air extracted from the premises D exhaust air 1 counter flow heat exchanger 2 supply air fan 3 extract air fan 4 electric heater 5 water heater cooler DX 6 outdoor air filter 7 ...

Page 11: ...SO R 1000 UV 1300 UV 1500 UV Right inspection side R1 Left inspection side L1 2 3 11 4 10 6 7 12 5 A D C B A C D B 2 3 11 4 5 10 6 7 12 A D B C 8 A D B C 8 VERSO R 1700 UV 2000 UV Right inspection side R1 Left inspection side L1 2 3 11 4 5 10 6 7 12 A B D C 8 A B D C 8 A D C B A D C B 2 3 11 4 10 6 7 12 5 ...

Page 12: ...RSO R 3000 UV 4000 UV Right inspection side R1 Left inspection side L1 A D B C 8 C B A D A D C B A D B C 8 2 3 11 4 10 6 7 12 5 2 3 11 4 10 6 7 12 5 VERSO R 5000 V HW HCW DX Right inspection side R1 Left inspection side L1 A D B C 8 A D C B 2 3 5 10 6 7 11 A D B C 8 5 3 2 10 6 7 11 A D C B ...

Page 13: ...R 5000 V HE Right inspection side R1 Left inspection side L1 A D B C A D C B 4 3 2 10 6 7 11 A D B C A D C B 2 3 4 10 6 7 11 VERSO CF 1000 UV 1300 UV 1700 UV Right inspection side R1 Left inspection side L1 A D B C A D B C A D C B A D C B 3 2 6 4 8 8 5 9 1 11 7 12 3 2 6 4 8 8 5 9 1 11 7 12 ...

Page 14: ...Left inspection side L1 D A B C D A B C A D C B C B A D 3 2 6 4 8 8 5 12 9 1 7 11 3 2 6 4 8 8 5 12 9 1 7 11 A outdoor intake air B air supplied to the premises C air extracted from the premises D exhaust air 1 counter flow heat exchanger 2 supply air fan 3 extract air fan 4 electric heater 5 water heater cooler DX 6 outdoor air filter 7 extract air filter 8 condensate drainage 9 air bypass damper ...

Page 15: ... L1 Left inspection side L2 R1 D B A C D B A C 10 10 2 4 7 11 12 3 6 10 10 2 4 7 11 12 3 6 VERSO R 2000 F Right inspection side R2 L1 Left inspection side L2 R1 A B D C A B D C 10 2 4 7 11 12 3 6 10 2 4 7 11 12 3 6 VERSO R 3000 F Right inspection side R2 L1 Left inspection side L2 R1 B C A D A B D C 10 2 4 7 12 11 3 6 10 2 4 7 12 11 3 6 ...

Page 16: ... side L2 R1 D A B C D A B C 8 1 4 7 2 12 3 6 9 11 8 1 4 7 2 12 3 6 9 11 VERSO S 1300 F 2100 F A B 11 4 2 6 5 VERSO S 3000 F A B 11 2 5 6 A outdoor intake air B air supplied to the premises C air extracted from the premises D exhaust air 1 counter flow heat exchanger 2 supply air fan 3 extract air fan 4 electric heater 5 water heater 6 outdoor air filter 7 extract air filter 8 condensate drainage 9...

Page 17: ...e unit must be selected with allowance for minimum access to the unit for mainte nance or service and must comply with safety requirements Opening for inspection can not be smaller than dimensions of the unit and unit itself must be mounted in a way that if needed for example in case of complicated repair it can be easily dismounted Minimum Maintenance Space for Horizontal Units 100 mm min 700 mm ...

Page 18: ...ing bracket 7 Ceiling holder Included in the unit set 3 1 f Picture Unit holder is made of 2 5 mm galvanized steel sheets according to EN 10142 Only for VERSO S 1300 F S 2100 F without internal electrical heater Only for VERSO S 1300 F S 2100 F R 2000 F R 3000 F without internal electrical heater A B 1 2 3 2 5 min 700 mm floor 3 1 c Picture B A 5 3 1 e Picture B ceiling A min 100 mm 5 B 1 Inspecti...

Page 19: ...4 71 5 750 17 30 16 12 36 50 VERSO S 3000 F 1049 75 1010 17 30 16 12 36 50 VERSO R 1300 F 974 82 400 450 400 17 30 0 12 36 50 VERSO R 2000 F 1244 91 400 400 280 400 400 17 30 49 5 12 36 50 VERSO R 3000 F 1243 155 560 730 560 16 30 52 13 5 43 5 70 VERSO CF 1000 F 1133 75 770 730 16 5 30 49 5 13 5 43 5 70 VERSO CF 1300 F 1133 75 770 730 16 5 30 49 5 13 5 43 5 70 VERSO CF 1500 F 1133 75 770 730 16 5 ...

Page 20: ...by turning it to the right or the left The drain line from the water trap must be arranged so that it will not damage adjacent unit sections or building ele ments If the drain line is run through cold spaces it should be insulated to prevent freezing A heating cable may be required 5 1 Water trap installation for a unit section mounted on the suction side Since the fans in most air handling units ...

Page 21: ...talled in connection with not less size pipe diameter Any drainage systems must not be connected directly to the municipal sewage system The con densate tray shall be easily accessible for cleaning and disinfection 5 3 Section to section joints Some air handling units are produced from three sections Separate sections are easy to install on site Ensure that sections or section assemblies are posit...

Page 22: ...le Water heaters in VERSO CF 1000 U H V and CF 2300 U H V units has automatic air bleed valves thus it s maximum operating pressure can not exceed 6 bar It is important to maintain air heaters and coolers cleanliness that is to change filters installed in the air handling unit on time If the air heater or cooler gets dirty to perform periodical cleaning 5 5 Ductwork The air flows in out air handli...

Page 23: ...ater falling on the electric motor 2 Plate heat exchanger check Inspection and dedusting of the plate heat exchanger is performed once per year it is removed from the unit and blown with an air blast or washed with tepid water Note plate heat exchanger may be replaced with summer cassette when recuperation is needless 3 Fans check once per year Polluted fans decrease efficiency Before performing a...

Page 24: ...rs are used make sure that filters are tightly inserted in it s designated place when replacing them Depending on the filter size in some cases it is needed to put additional sealing gasket on the filter frame to ensure that there is no gaps between filter and AHU casing Pressure sensor 6 Picture 7 Pressure sensor setting which indicates impurity of filters Pressure sensor is set according to EN 1...

Page 25: ...3000 F 7 1 3 400 16 12 19 9 3 400 9 2 720 500 400 289 4000 UH H 9 7 3 400 26 3 31 1 3 400 15 2 1830 500 400 470 4000 UV V 9 7 3 400 26 3 31 1 3 400 15 2 1830 500 400 470 5000 V 8 1 3 400 40 29 5 3 400 15 2 1215 300 1100 600 5000 H 13 1 3 400 20 1 2 1000 1000 500 442 7000 H 18 1 3 400 34 9 2 1340 1200 600 765 VERSO CF 1000 UH H 3 3 1 230 8 7 9 5 3 400 4 5 2 178 Ø 315 269 1000 UV V 3 3 1 230 8 7 9 5...

Page 26: ...00 UH H UV V 4000 UH H UV V Compact F7 x2 525x510x46 F5 x2 525x510x46 3000 F Compact F7 560x540x96 F5 560x540x96 5000 V Compact F7 x2 650x630x92 F5 x2 650x630x92 5000 H 7000 H Bag F7 x2 592x592 8x500 F5 x2 592x592 8x500 VERSO CF 1000 UH H UV V 1300 UH H UV V 1700 UH H UV V Compact F7 800x400x46 F5 800x400x46 1000 F 1300 F 1500 F Compact F7 550x420x46 F5 550x420x46 2300 UH H UV V Compact F7 800x400...

Page 27: ...00 500 500 500 Left L1 1000 1606 618 370 618 1000 269 269 269 269 500 500 500 500 Right R2 1000 1606 618 370 618 1000 269 269 269 269 500 500 500 500 Left L2 1000 1606 618 370 618 1000 269 269 269 269 500 500 500 500 3000 UH H 4000 UH H Right R1 1150 2100 650 700 750 1150 303 303 303 303 323 827 827 323 Left L1 1150 2100 650 700 750 1150 303 303 303 303 827 323 323 827 5000 H Right R1 1300 1872 75...

Page 28: ...1700 UH H Right R1 910 1960 1810 905 242 242 242 242 253 625 625 253 Left L1 910 1960 1810 905 242 242 242 242 625 253 253 625 2300 UH H Right R1 910 2060 2000 905 239 239 239 239 250 648 648 250 Left L1 910 2060 2000 905 239 250 239 250 648 250 250 648 3500 UH H Right R1 1150 2500 1150 303 303 303 303 827 323 827 323 Left L1 1150 2500 1150 303 303 303 303 827 323 827 323 3 L1 L2 when the device f...

Page 29: ...1 1150 2100 750 700 650 1181 1150 328 5 328 5 328 5 328 5 323 827 323 827 Left L1 1150 2100 750 700 650 1181 1150 328 5 328 5 328 5 328 5 323 827 323 827 5000 V HW HCW DX 5000 V HE Right R1 1405 1900 700 500 700 1400 150 546 150 546 150 702 5 702 5 702 5 702 5 Left L1 1405 1900 700 500 700 1400 150 546 150 546 150 702 5 702 5 702 5 702 5 VERSO CF 1000 UV V 1300 UV V 1700 UV V Right R1 910 1810 980...

Page 30: ...305 305 305 305 3000 F Right R2 L1 1318 1210 2220 2160 648 324 303 303 303 303 Left L2 R1 1318 1210 2220 2160 648 324 303 303 303 303 VERSO CF 1000 F 1300 F 1500 F Right R2 L1 1210 1100 1795 1650 527 263 275 275 275 275 Left L2 R1 1210 1100 1795 1650 527 263 275 275 275 275 2500 F Right R2 L1 2045 2000 1910 1850 528 263 5 500 500 500 500 Left L2 R1 2045 2000 1910 1850 528 263 5 500 500 500 500 9 4...

Page 31: ......

Page 32: ...mes filiāle Alejas iela 12A LV 4219 Valmiermuiža Valmieras pagasts Burtnieku novads Tel 371 29 358 145 kristaps zaicevs komfovent com www komfovent lv www komfovent com PARTNERS AT J PICHLER Gesellschaft m b H www pichlerluft at BE Ventilair group www ventilairgroup com ACB Airconditioning www acbairco be CZ REKUVENT s r o www rekuvent cz CH WESCO AG www wesco ch SUDCLIMATAIR SA www sudclimatair c...

Reviews: