OPERATION
TRANSPORTATION
145
When loading or unloading, always use ramps or a platform and
carry out the operations as follows.
1. Properly apply the brakes on the trailer and insert blocks(2)
beneath the tyres to ensure that it does not move. Then fix
the ramps in line with the centers of the trailer and the
machine. Be sure that the two sides are at the same level as
one another.
Make the angle of the ramps (3) a maximum of 15°.
Set the distance between the ramps (A) to match the center of the
wheels.
2. Set the travel speed switch to the Mi position.
3. Turn the auto-deceleration switch OFF, and return the fuel
control dial to reduce the engine speed.
4. Turn the swing lock switch ON to apply the swing lock.
5. Set in the direction of the ramps, lower the work equipment as
far as possible without letting it hit the trailer, then travel
slowly to load or unload the machine.
When on the ramps, do not operate any lever other than the travel
lever.
6. Load the machine correctly in the specified position on the
trailer.
REMARK
When the work equipment is installed, load the machine from
the front; when the work equipment is not installed, load the
machine from the rear.
AD052900A
(3)
(2)
(A)
(1)
AD157790A
AD157780A
Summary of Contents for PW130ES-6K
Page 11: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR 10 ...
Page 56: ...55 OPERATION ...
Page 164: ...163 MAINTENANCE ...
Page 232: ...231 SPECIFICATIONS ...
Page 234: ...SPECIFICATIONS SPECIFICATIONS 233 1 PIECE BOOM ...
Page 235: ...SPECIFICATIONS SPECIFICATIONS 234 2 PIECE BOOM ...
Page 238: ...237 OPTIONS ATTACHMENTS ...