1.
Press the spring on the bottom ball bearing.
2.
Tilt the bottom part of the door towards the enclosure’s interior, enabling
the ball bearing to slip out of the aluminium groove. The door should
hang by the upper ball bearings only.
3. Slightly lift the entire glass door so that it slips from the aluminium
groove.
4. Lubricate the ball bearings.
5. Reattach the glass door to the massage shower enclosure.
We recommend lubricating the ball bearings once or twice per year, or more,
depending on the frequency of opening/closing of the massage shower
enclosure door.
GENERAL WARNINGS ON CONNECTION AND
INSTALLATION
o
The massage cabin is allowed to be connected to the water supply with
minimum pressure of 0.2 MPa (2 bar) but not more than 0,4 MPa (4 bar).
Connection to a higher water pressure is not allowed without the installation of
additional limiters set at 0.4 MPa (4 bar). Kolpa d. d. does not recognise any
claims which might arise from a higher water pressure than allowed for this
product.
o
Connecting the water inlet hose to the massage cabin or pillar shall be
performed in a way avoiding that a pillar or wall would PRESS directly to the
connecting pipe or any other pipe of the massage system. To install the main
water inlet on the wall connector we recommend using of an ANGLED
connector or a 90° ELBOW for an easier connection and relieved joints.
o
Kolpa d. d. does not recognise any claims which might arise from an
inappropriate installation.
o
Positions of electrical outlets, hot and cold water drains and inlets, as shown in
the attached drawings and installation instructions, are showing only one of
the possible layouts of these connections. Their position is allowed to change
to any other location within the dimensions of the item, as long as this position
does not interfere with the function / operation of the elements mounted on the
pillar or a massage cabin. Hot and cold water supply pipes can, if necessary,
be extended or replaced with pipes of suitable length. Kolpa d. d. does not
recognise any claims which might arise from damage made by replacing or the
quality of the replacing pipes.
o
To remove particles from the pipes, the water supply needs to be drained by at
least 25-50 litres of water before connecting the pillar or massage cabin.
o
Inlet of each product connected to a water source is recommended to feature
a stop valve. If this valve is already installed in the existing water installation
scheme and is able to stop water just for your apartment or bathroom, then the
installation of an additional valve is not required. CAUTION! Pay attention to
the dimensions of the valve, as the massage pillars leave very little space for
connection to the water network. Angled or straight ball valves of smaller
dimensions are recommended.
Summary of Contents for Kolpa-San ZEPHYR 1680 3F
Page 2: ...1 www kolpasan eu PICTURE 1a ...
Page 3: ...2 www kolpasan eu PICTURE 1b ...
Page 4: ...3 www kolpasan eu PICTURE 2 ...
Page 5: ...4 www kolpasan eu PICTURE 3 ...
Page 6: ...5 www kolpasan eu PICTURE 4 ...
Page 7: ...6 www kolpasan eu PICTURE 5 ...
Page 8: ...7 www kolpasan eu PICTURE 6 ...
Page 18: ...www kolpasan eu ...
Page 19: ...www kolpasan eu ...
Page 22: ...1 www kolpasan eu BILD 1a ...
Page 23: ...2 www kolpasan eu BILD 1b ...
Page 24: ...3 www kolpasan eu BILD 2 ...
Page 25: ...4 www kolpasan eu BILD 3 ...
Page 26: ...5 www kolpasan eu BILD 4 ...
Page 27: ...6 www kolpasan eu BILD 5 ...
Page 28: ...7 www kolpasan eu BILD 6 ...
Page 38: ...www kolpasan eu ...
Page 39: ...www kolpasan eu ...