refrigerant shall be recovered from the system, or isolated (by means of shut off
values) in a part of the system remote from the leak. Oxygen free nitrogen (OFN)
shall then be purged through the system both before and during the brazing
process.
12. Removal and evacuation
When breaking into the refrigerant circuit to make repairs or for any other purpose
conventional procedures shall be used. However, it is important that best practice is
followed since flammability is a consideration. The following procedure shall be
adhered to:
•
Remove refrigerant;
•
Purge the circuit with inert gas;
•
Evacuate;
•
Purge again with inert gas;
•
Open the circuit by cutting or brazing.
The refrigerant charge shall be recovered into the correct recovery cylinders. The
system shall be flushed with OFN to render the unit safe. This process may need to
be repeated several times. Compressed air oxygen shall not be used for this task.
Flushing shall be achieved by breaking the vacuum in the system with OFN and
continuing to fill until the working pressure is achieved, then venting to atmosphere,
and finally pulling down to a vacuum. This process hall be repeated until no
refrigerant is within the system. When the final OFN charge is used, the system
shall be vented down to atmospheric pressure to enable work to take place. This
operation is absolutely vital if brazing operations on the pipe-work are to take place.
Ensure that the outlet for the vacuum pump is not close to any ignition sources and
there is ventilation available.
13. Charging procedures
In addition to conventional charging procedures, the following requirements shall be
followed. Ensure that contamination of different refrigerants does not occur when
using charging equipment. Hoses or lines shall be as short as possible to minimise
the amount of refrigerant contained in them.
Cylinders shall be kept upright.
Ensure that the refrigeration system is earthed prior to charging the system with
refrigerant. Label the system when charging is complete (if not already).
Extreme care shall be taken not to overfill the refrigeration system.
Prior to recharging the system it shall be pressure tested with OFN. The system
shall be leak tested on completion of charging but prior to commissioning. A follow
up leak test shall be carried out prior to leaving the site.
14. Decommissioning
Before carrying out this procedure, it is essential that the technician is completely
familiar with the equipment and all its detail. It is recommended good practice that
all refrigerants are recovered safely. Prior to the task being carried out, an oil and
refrigerant sample shall be taken in case analysis is required prior to re-use of
reclaimed refrigerant. It is essential that electrical power is available before the tas
is commenced.
SAFETY OPERATION OF FLAMMABLE REFRIGERANT
- 25 -
Summary of Contents for KAG-110RSINV
Page 2: ...MODELS KAG 110RSINV KAG 145RSINV KAG 200RSINV KAG 240RSINV ...
Page 13: ......
Page 31: ...KPII 20190319 ...