4. Install the faucet and the washbasin drain respectively onto the cabinet and
the washbasin by following the attached installation instructions. Connect the
faucet pull bar with the drain.
5. Fix onto the wall.
a. Have the cabinet and washbasin slightly lifted with two person. Hook the two
hooks on the back of the cabinet onto the pre-installed wall bracket.
b. Turn the two wooden stoppers at the bottom of the cabinet by 90°, so that the
backboard falls down to the floor. See the figure below.
4.
按照配套龙头和落水的安装说明将龙头和落水安装在浴柜和台盆上,并将龙头
提拉杆与落水连接起来。
5.
与墙面固定。
a
. 由两人稍稍抬起浴柜和台盆,将柜体后部的 2 个挂钩挂在墙面预先安装好的托
墙挂片上。
b
. 将浴柜底部的 2 个木质的挡块旋转 90 度,使后背板落在地板上。见下图。
c. Adjust the the cabinet to be level and properly away from the wall by adjusting
the wall clips. See the figure below.
c
. 通过调节吊码调节浴室柜的水平及与墙面的距离。见下图。
d. After the adjustment is correctly completed, fix the cabinet onto the wall with
the attached screws in the hardware package. (The holes and the embedded
parts have been prepared in the first step. See Figure 3.)
d
. 确认调整无误后,用五金包中的配套的螺丝将浴柜与墙面再次连接起来。(墙面
上的孔和预埋件在第一步中已完成,见图 3)
后背板挡块
Stopper For Back Board
旋转该挡块
Rotating The Stopper
使后背板落下
Backboard Fall Down
MAX1
2
4
3
1
8
通孔
8 Hole
Fig. 9
图
9
Fig. 10
图
10
Fig. 11