-5-
5.
·
·
·
·
·
5. Complete the Installation
Install the Drainage
Install the Door Knobs
NOTE:
The cabinet could be installed in Floor drainage or
Inwall drainage.
'
·
·
From the back side of the door, insert the screw through
the predrilled hole to the front.
Thread the knob onto the screw. Tighten securely.
·
·
·
Refer to the lavatory or drainage manufacturer s
instructions for proper installation.
Reinstall the doors after drainage has been installed.
Make adjustments to the door(s) and hinges as needed.
Refer to the sections to follow for proper adjustment.
·
·
·
·
·
Install the faucet (if applicable) and drain to the lavatory.
Refer to the faucet and drain manufacturer
s installation
instructions.
Siliconized acrylic caulk must be used to secure the
lavatory to the vanity. Do not use 100% silicone sealant,
which will damage the finish of the vanity.
Run a 6mm continuous bead of siliconized acrylic caulk
around the top of the vanity, as illustrated.
Vitreous china lavatories are very heavy. Get
help lifting and aligning the lavatory.
The lavatory is properly positioned when: (1) the back
edge of the lavatory is flush against the finished wall and (2)
the overhang on the left, right, and front side of the lavatory is
equal on each side of the vanity.
With assistance, lift and properly position the lavatory on
top of the vanity.
Immediately wipe away any excess caulk that contacts
the vanity.
Run a 3mm bead of siliconized acrylic caulk along the top
edge of the lavatory where the lavatory contacts the
finished wall.
NOTICE:
CAUTION: Risk of personal injury or product
damage.
NOTE:
·
·
·
·
·
6mm
1
2
3mm
Screw
Knob
1188934-T01-B