Remove the old gasket from the floor
and the closet flange with a putty knife.
Remove the old T-bolts and discard
them.
if the new toilet is not
installed immediately, temporarily stuff
a rag into the closet flange.
NOTICE:
T
NOTICE:
Do not use white cement or
high lime content cements to install
this toilet. The expansion of cement
due to a rise in temperature may make
the toilet crack or cause damage.
Kohler is not responsible for any
damage caused by installation with the
use of cement.
TO INSTALL SUPPLY
SHUT-OFF VALVE
Install the supply shut-off valve so it is
67mm (2-5/8") above the finished floor
line, and 194mm (7-5/8") to the left of
the closet flange centerline.
The centerline of the supply shut-off
valve outlet should extend 67mm
(2-5/8") from the finished wall. Install
the supply shut-off valve with the outlet
vertical.
Closet Flange
Supply Shut-Off Valve
Closet Flange
Centerline
194
305
67
-3-
10mm
TO INSTALL BOWL
Position the template and align with
drain hole.
Mark down the position of foot and 5
holes.
Drive holes on ground with the driver
of 10mm (3/8"), then insert anchor to
holes.
Drain Hole
3/8
10mm