2
1160104-W2-D
Note!
If being installed as part of an enclosure refer to the Side Panel Installation and
User Guide.
Safety Information
1.
Care should be taken when drilling into walls and floors to avoid any hidden pipes or
wires.
2.
We strongly recommend that all glass panels are moved by a minimum of two people
and that any protective packaging along the glass edges is kept in place for as long as
possible to prevent damage before installation.
3.
During installation we recommend additional help in lifting heavy doors and side panels.
4.
Wear protective footwear when lifting panels.
5.
Wear safety glasses when drilling.
Wall Preparation
GENERAL INFORMATION
The wall channels must
be installed onto a tiled or
waterproof finished flat and
even wall surface. Failure to do
so will result in an unsatisfactory
seal, which may cause property
damage.
INTRODUCTION
Thank you for purchasing a quality KOHLER
®
product. To enjoy the full potential of your new
product, please take time to read this guide thoroughly, having done so, keep it handy for
future reference.
The following pages aim to provide comprehensive installation instructions, plus advice on
how to care and maintain your product.
We recommend that the unit is installed by a qualified plumber or engineer.
General
1.
Read all of these instructions and retain this guide for later use.
2.
Pass on this guide in the event of change of ownership of the installation site.
3.
Follow all warnings, cautions and instructions contained in this guide.
4.
Remove all protective tape from the enclosure before installation.