background image

1237458-T01-A

0.18~0.55MPa.

K-5888T(3L/DC)/K-5888T-C05(3L/AC)

3L

K-5888T-W(1L/DC)/K-5888T-WC05(1L/AC)

1L

K-5888T-Y(0.5L/DC)/K-5888T-YC05(0.5L/AC)

0.5L

1~ 55 C

0.07Mpa(

)~0.86MPa(

)

2

5

2

5

(AA

2)(

)

220V AC 50/60Hz (

)

SPECIFICATIONS

-2-

Power

Liter per flushing

Temperature

Starting pressure

Testing time

Detecting method

2 AA size alkaline batteries(DC)

220V AC 50/60Hz (AC)

"

"

Water pressure at 0.18~0.55 MPa:
Less than 3L (K-5888T(3L/DC)/K-5888T-C05(3L/AC))
Less than 1L (K-5888T-W(1L/DC)/K-5888T-WC05(1L/AC)
Less than 0.5L (K-5888T-Y(0.5L/DC)/K-5888T-YC05(0.5L/AC)

)

)

Environmental temperature: 1 to 55 C

0.07Mpa (Dynamic pressure)~0.86MPa (Static pressure)

About 2 to 5 seconds

Detecting the urine and human movement

ROUGHING-IN

Unit:mm

Reference Value

Kohler reserves the right to change marked dimensions without prior notice.

Fig.1

1

·

Roughing-in dimensions are identical if using an optional

3"outlet spud.

·

3"

* Recommended dimensions for installation only, please

adjust according to actual situation.

*

2" NPT Tap
2"

Supply

Floor

Wall

361

545

165

158

302

73

340

91

*600

*447

32

744

40

Summary of Contents for STRUKTURA K-5888T

Page 1: ... that pertain to your particular installation This will help you avoid costly mistakes In addition to proper installation read all operating and safety instructions All information in these instructions is based upon the latest product information available at the time of publication Kohler China reserves the right to make changes in product characteristics packaging or availability at any time wi...

Page 2: ... C05 3L AC Less than 1L K 5888T W 1L DC K 5888T WC05 1L AC Less than 0 5L K 5888T Y 0 5L DC K 5888T YC05 0 5L AC Environmental temperature 1 to 55 C 0 07Mpa Dynamic pressure 0 86MPa Static pressure About 2 to 5 seconds Detecting the urine and human movement ROUGHING IN Unit mm Reference Value Kohler reserves the right to change marked dimensions without prior notice Fig 1 1 Roughing in dimensions ...

Page 3: ...on Notice To ensure an effective flush performance strongly recommended inner diameter of water supply including water meter valve etc is no less than 25mm and supplied water pressure sensor inlet dynamic pressure is 0 18MPa 0 55MPa 25mm 0 18MPa 0 55MPa A Install hangers L shape block and waste pipe connector Drill holes according to template Install hangers L shape block and waste pipe connector ...

Page 4: ...ox assembly at the bottom Load batteries 5 Pull the bottom of the urinal outwards to make space Align the big nut with the waste pipe and then tighten 6 Push the urinal against wall and tighten it with screws 7 Fix the connectors and then put the fixture valve and battery box assembly back into the urinal 8 Apply silicone sealant between urinal and wall 1 3L 2 3 4 5 6 7 8 Fig 5 5 Fig 4 4 Fig 6 6 F...

Page 5: ...tight 5 Screw tight the nut of the drain mentioned in step 3 4 5 2 Fig 8 8 2 As shown in the picture below if the position of the urinal needs to be adjusted please take down the urinal and knock the hanger slightly to adjust its position upwards and downwards 2 Adjust Upwards and Downwards 3 After the position of the urinal is decided completely fix the hanger with the bolt through the fixing hol...

Page 6: ...13 13 2 Install the manual button Insert the button into the hole then put on the washer and the nut 2 Fig 12 12 E Install the manual button and magnetic valve E 1 Install the magnetic valve 1 6 Screw on the drain lid For first time installation the water may drain slowly It can be improved by loosening the drain cover The drain after being loosened is as shown 6 Fig 11 11 ...

Page 7: ...lling K 5888T K 5888T W or K 5888T Y DC 2 Please match 16306T NA AC power unit when installing K 5888T C05 or K 5888T WC05 or K 5888T YC05 AC The way of installation is as shown 1 K 5888T K 5888T W K 5888T Y 21 2 K 5888T C05 K 5888T WC05 K 5888T YC05 16306T NA CAUTION a Do not connect 220V AC Power supply to DC wiring terminal b Do not damage the covering of AC power unit or remove screws to avoid...

Page 8: ...s cut according to acted installation requirements The length of cut wire is recommended less than 10m e The head AC power supply must be protected with appropriate fuse f Please confirm the AC power supply and water supply should be shut off before maintaining the products with AC power related 2 2 a b c d 0 5mm 0 3mm 10m e f 2 2 8 Fig 19 19 B When installing the power uint on the ceiling please ...

Page 9: ...Replacement of Batteries When the batteries run out please remove the Battery Box Assembly by following the instructions in step C and then replace the batteries C Screw M3 22 M3 22 Cover of Battery Box Battery Box Fig 21 21 USER S GUIDE USER S GUIDE Illustrations The urinal will automatically flush after using Fig 20 20 3 2 1 ...

Page 10: ...is mode by pressing the manual button for about 5 seconds The controller stops ringing after the urinal exiting this mode This function can be used after the power is turned on for ten minutes 2 Notice Manual Button Fig 22 22 10 MAINTENANCE Fig 23 23 Clean the Filter Screen If the flushing volume reclines sharply after installation or used for a long time with no cause from water pressure the filt...

Page 11: ...er The sensor is an electronic instrument 2 Keep away from strong electromagnetic field 3 Clean the urinal with soft rag and neutral liquid detergent Do not use eradicator abrasive powder or oil acid or alkali liquid detergent 4 Urinal is designed for use with potable water Avoid water that includes a lot of contaminants or acid alkali water and impure water 5 All electrical connection must be com...

Reviews: