15. Confirm Proper Operation
Installation Checkout
Verify all electrical connections.
Verify that the pump banding straps have been cut.
Fill the Whirlpool
Position the jet nozzles so they face down toward the basin. Turn the jet trim rings fully
counterclockwise.
Fill the whirlpool to at least 2
″
(51 mm) above the top of the highest jet.
Operating Sequence
NOTE:
If you encounter problems with the operating sequence, refer to the
″
Troubleshooting
″
section.
Press the air switch to turn on the whirlpool jets.
Verify that the pump starts and operates without excessive noise or vibration.
Verify that water is circulating and flowing from each jet.
Adjust each jet for optimum flow. Turn the trim ring clockwise to decrease the flow, and
counterclockwise to increase the flow.
Press the air switch a second time to turn off the whirlpool.
Drain the whirlpool.
16. Install the Apron Access Panel
IMPORTANT! Risk of product damage.
Ensure that the tabs are aligned before pressing the apron panel
into place. Improper alignment can damage the clips.
Ensure that the apron area is free from obstructions.
Align the center clip of the access panel with the center slot of the apron frame.
Press the center clip until the apron panel snaps into place.
Slide the apron panel up under the apron frame until the two top clips engage and the apron panel
aligns with the remaining clip positions.
When positioned, press on each of the remaining clip locations to engage the snap-in clips.
Fill with water at least 2" (51 mm)
above the highest jet.
Turn the jet trim ring
clockwise to
decrease the flow.
Position the jet
nozzles to direct
the water flow as
desired.
Turn the jet trim ring counterclockwise
to increase the flow.
Press the air switch to turn the
whirlpool on or off.
Sterling
19
1016902-2-F