-5-
STEP
2
Fix the top and bottom frames on the wall jamb.
Before fixing top and bottom frames, make sure of the following: 1. Wall and wall jamb is properly
connected. 2. Seals are properly inserted.
1.
2.
Note:
The wall jamb
be kept vertical.
must
Fix wall jambs.
STEP
3
Inside
Outside
Inside
Outside
Connector
Seal
0mm
The wall jamb
be kept vertical.
must
0mm
6mm
1280148-T01-A