background image

-3-

X2

X4

X4

X4

X2

X2

X6

X5

X2

X8

X20

X5

X1

X1

X1

X1

X2

X1

X1

X1

X1

X1

X1

X1

Cover Seal

Top Roller Assy, Skyline Bypass

Top Rail, Skyline Bypass

Wall, Skyline Bypass

Wall Jamb,
Skyline Bypass

Door Glass,
Skyline Bypass

Side Metal Handle,
Skyline

Long Bottom Roller Assy,
Skyline Bypass

--

Short Bottom Roller Assy,
Skyline Bypass

--

Bottom Rail,
Skyline Bypass,

Insert Seal,
Skyline Bypass

Corner Edge, Skyline Bypass

Corner Post,
Skyline Bypass

Frame, Side Panel, Skyline Sliding

Glass, Side Panel,
Skyline Bypass

Wall Jamb, Side Panel,
Skyline Bypass

Wall,
Skyline Bypass

Side Top Frame,
Skyline Sliding

Top Rail, Skyline Bypass

Bottom Rail, Skyline Bypass

Wall Jamb, Skyline Bypass

Wall, Skyline Bypass

Corner Post, Skyline Bypass

Corner Edge, Skyline Bypass

Wall, Side Panel, Skyline Sliding

Wall Jamb, Side Panel, Skyline Bypass

Frame, Side Panel, Skyline Sliding

Side Top Frame, Skyline Sliding

Insert Seal, Skyline Bypass

Cover Seal

Insert Seal

Top Roller Assy, Skyline Bypass

Long Bottom Roller Assy, Skyline Bypass

--

Short Bottom Roller Assy, Skyline Bypass

--

Twist Lock Jamb Moulding, Assy, Skyline Sliding

Insert Seal

Side Metal Handle, Skyline

Hollow Wall Anchor, Nylon

Pan Screw ST3.5X40

ST3.5X40

Csk Screw ST3.5X6

ST3.5X6

Screw Key 4mm

Screw Key 2.5mm

1280148-T01-A

Summary of Contents for SKYLINE K-706032T-FM-SHP

Page 1: ...ed prior to installing your shower door Prepare waterproof layer to wall and floor of the showering area It is not allowed for any presence of electric switches and sockets Make sure the floor drain r...

Page 2: ...SKU K 81518T K 706032T 1200 1600 300 1100 1850 2000 800 820 2628 IMPORTANT 800 820 2628 Before installation check that all components are correctly supplied If any parts are missing please ring the he...

Page 3: ...kyline Bypass Wall Skyline Bypass Side Top Frame Skyline Sliding Top Rail Skyline Bypass Bottom Rail Skyline Bypass Wall Jamb Skyline Bypass Wall Skyline Bypass Corner Post Skyline Bypass Corner Edge...

Page 4: ...nry Drill 6mm Drilll Bit Level Drop Cloth Materials Required Tape Silicone Sealant Tools Required 6mm INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS INSTALLATION STEP 1 IMPORTANT MUST Tray be lev...

Page 5: ...om frames make sure of the following 1 Wall and wall jamb is properly connected 2 Seals are properly inserted 1 2 Note The wall jamb be kept vertical must Fix wall jambs STEP 3 Inside Outside Inside O...

Page 6: ...cal The length shall be the same on two sides Then rotate the lock to fix wall jamb Fix side panel Fix corner post STEP 5 STEP 4 After assembly After assembly IMPORTANT MUST Tray be level along front...

Page 7: ...te STEP 7 STEP 8 Install top and bottom rollers The caps shall be installed after the door glass is adjusted Install bottom roller after the door is adjusted to a proper position Fix the cap Adjust th...

Page 8: ...P 9 Install and adjust handle Install handle Do not use the enclosure for at least 24 hours 24 24hrs STEP 11 STEP 10 Apply silicone sealant to both sides of the bottom threshold After assembly 1280148...

Reviews: