-5-
STEP
2
Fix the top and bottom frames on the wall jamb.
0mm
The wall jamb
be kept vertical.
must
The wall jamb
be kept vertical.
must
0mm
Fix wall jambs. One is fixed on the wall. The other is not fixed on the wall after the holes are drilled.
20mm
Note:
There is only holes
on the top frame.
Section of frame
Inside
Outside
A
A
6mm
STEP
3
Note:
Before fixing top and
bottom frames, make sure wall
and wall jamb is properly
connected.
1278975-T01-A