Roughing-In for K-5264
•
The distance between the rim and the floor (dimension H) is 30
″
(762 mm) for grade schools and 36
″
(914 mm) to 44
″
(1118 mm)
for other buildings.
1. Prepare the Site
NOTE:
Be sure to install sufficient backing to support the wall
hangers and anchor bolt.
Rough-in the supply and drain piping according to the
roughing-in.
Temporarily install a capped length of 1-1/4
″
and 3/8
″
pipe to
the drain and supply to extend a minimum of 2
″
(51 mm) beyond
the finished wall.
Floor
H
3-1/4"
(83 mm)
3"
(76 mm)
3-3/8" (86 mm)
Ø 7/16" (11 mm)
Anchor Screw Hole in Back
4" (102 mm)
7/8"
(22 mm)
3/8" NPT
Supply
9-1/4"
(235 mm)
6"
(152 mm)
3-1/4"
(83 mm)
2-1/2" (64 mm)
13" (330 mm)
13"
(330 mm)
1-1/4" NPT Tap
5"
(127 mm)
14" (356 mm)
4-5/8"
(117 mm)