background image

13

113019-

CA

 (1093)

Kohler Co., Kohler WI

11.  INSTALL APRONS

Locate the screws removed during bath inspection.

This apron system is designed to have the finished wall
materials go over the apron columns. It is also designed
to have the finished floor materials butt up against the
pan base.

Slip the top of an apron up into the channel groove.  Tilt
the apron inward. Align the bottom of the apron with the
pan base. The apron should align with both the bath rim
and the edges of the apron columns, and with the
predrilled holes in the pan base.

Secure the apron to the pan base with screws.

Repeat for other apron.

Supplied Drywall Screw

Large Apron

Small
Apron

Supplied Drywall
Screws

12.  INSTALL FINISH WALL

Protect the inside of the bath to prevent damage.
Construction damage is not covered under
warranty! 

NOTICE: Before covering the framing, perform the
following: 
 Open hot and cold valves and check all
supply connections for leaks.  Fill the bath to the overflow
and check overflow and drain connections for leaks.

Protect bath surface.  Cover framing and walls with
gypsum wallboard.  Tape and mud drywall... seal drywall
and joints under bath rim.  Install finished wall material
to subwall.  Seal joints between the bath rim and finished
wall using silicone sealant.

Stud

Gypsum
Wallboard

Finished Wall
Covering

RTV Water
Resistant
Sealer

Bath

Summary of Contents for Precedence K-1353-AA

Page 1: ...Precedence Baths K 1353 AA K 1354 AA 113019 CA 1093 Copyright 1993 Kohler Co...

Page 2: ...cted by a qualified licensed electrician For J1 and JA models only A green colored terminal or a wire connector marked G GR GROUND or Grounding is provided within the terminal compartment To reduce th...

Page 3: ...ION 10 FIELD WIRE COMPRESSOR 11 Service Requirements 11 Identify Electrical Requirements 11 Connect Control 120 V 60 Hz 11 TEST DOOR SYSTEM 12 Operating Sequence 12 Troubleshoot Door System 12 INSTALL...

Page 4: ...rcuit Interrupter GFCI Air Compressor 120 V 15 A 60 Hz Door seal system rating 120 V 60Hz 3 A C PRODUCT INFORMATION Fixture basin area top area weight Bathing well 43 x 19 1 2 52 x 24 1 2 143 lbs wate...

Page 5: ...ts warranty or otherwise for personal injury or damage caused by any such unauthorized modification Use a separate service for the door air compressor 3 PRODUCT REQUIREMENTS A SUMMARY OF KEY REQUIREME...

Page 6: ...led in new or existing bathrooms For new installations Position plumbing according to roughing indimensions located on page 4 Cap supplies and check for leaks For replacement installations Remove old...

Page 7: ...ose to 60 Size the stud pocket accordingly NOTE The stud pocket must fit the width of the unit exactly The bath is shipped with a spacer bar to pre vent spreading or squeezing of the door opening This...

Page 8: ...upport for the hand spray on vertical slide bar if used Route piping and adapt framing as necessary for the hand spray supply elbow pressure balanced mixer valve and high flow tub filler and valves Re...

Page 9: ...not level some leveling of the bath area will be necessary Do not support the weight of the bath by the flange Do not use drywall plaster as a means of support Drain Hole Shims B TO ADJUST LEVEL Shim...

Page 10: ...amiliarize yourself with the location of all major components before proceeding to field wiring by a licensed electrician suction elbow adjustment trim kit installation and testing and troubleshooting...

Page 11: ...B IDENTIFY ELECTRICAL REQUIREMENTS The model number is printed on a plate at the seat end of the module The model number identifies electrical rating Electrical connections for each model vary K 1353...

Page 12: ...ter Line 2 Min B TROUBLESHOOT DOOR SYSTEM This troubleshooting guide is for general aid only A Kohler Authorized Service Representative or a qualified electrician should correct all electrical problem...

Page 13: ...base with screws Repeat for other apron Supplied Drywall Screw Large Apron Small Apron Supplied Drywall Screws 12 INSTALL FINISH WALL Protect the inside of the bath to prevent damage Construction dam...

Page 14: ...pressure to secure kick strip to bath base Kick strip 14 CLEAN UP AFTER INSTALLATION Do not use abrasive cleaners as they may scratch and dull the unit surface Use warm water and a liquid detergent to...

Page 15: ...113019 CA 1093 Kohler Co Kohler WI 15...

Page 16: ...113019 CA 1093 Kohler Co Kohler WI...

Reviews: