Notice:
a. Keep the connector away from water.
b. Don’t mistake the direction of inlet and outlet.
c. Do not connect the DC output of AC power unit to AC
power supply.
d. Do not connect to power supply while installing. Connection
line is not supplied. AC connection wire with insulating
sleeving is recommended. Wire of which the nominal section
area of conductor is not less than 0.5mm
2
is also recommend.
DC connection line use wire of which the nominal section area
is not less than 0.3mm
2
. It is cut according to acted installation
requirements (The length of cut wire is recommended less than
10m).
e. The head AC power supply must be protected with
appropriate fuse.
f. Please confirm the AC power supply and water supply should
be shut off before maintaining the products with AC power
related.
注意
:
a.
不要让电线接插件接触水。
b.
不要将进出水方向弄错。
c.
不可将交流电源盒的直流输出端与交流电连接。
d.
安装时不要向电源盒供电。连接线请用户自备,建
议交流电源线采用导体标称截面积
≥
0.5mm
2
的电线,
直流连接线采用导体标称截面积
≥
0.3mm
2
的电线,
电线长度根据实际安装需要自行裁剪(建议连接线
长度小于
10m
)。
e.
交流电的总电源必须有合适的熔断丝加以保护。
f.
维修时必须断开交流电源并关闭水源。
3.
Tighten the slurry mold and valve box with short screws
and then apply slurry into the crevice around the valve box.
Lay the tiles.
4.
When the slurry turns solid, remove the short screws, pull
out slurry mold, mount the bracket assy, and secure with
long screws.
3.
用短螺钉将灰浆模套与阀盒旋紧后用灰浆填埋冲洗阀盒体四
周槽道,张贴瓷砖。
4.
灰浆固化后,取下短螺钉,揭去灰浆模套,并用长螺钉固定
安装架。
Valve Box
阀盒
Tiles
瓷砖
Slurry Mold
灰浆模套
Slurry Mold
灰浆模套
Short Screw M4x10
短螺钉
M4x10
Long Screw M4x50
长螺钉
M4x50
8
1146966-T01-C