Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Tools and Materials
Before You Begin
Observe all local plumbing and building codes.
IMPORTANT!
The slide bar must be mounted to stud framing
supports at both the top and bottom mounting locations. Plastic wall
anchors will not support the slide bar. Do not use or depend on
plastic wall anchors to attach the slide bar.
NOTE:
The slide bar should not be installed in an area 24
″
(61 cm)
to 48
″
(121.9 cm) from the floor (the critical support area as defined
in ASTM F446).
Kohler Co. reserves the right to make revisions in the design of
products without notice, as specified in the Price Book.
Blade
Screwdriver
Drill and 3/16" Bit
Tape
Measure
Level
Pencil
Sealant
1046145-2-A
2
Kohler Co.
Summary of Contents for K-974
Page 15: ...1046145 2 A ...