background image

-4-

INSTALLATION

STEP

1

STEP

2

The wall jamb

be kept

vertical.

must

The wall jamb

be kept

vertical.

must

0mm

6mm

6mm

0mm

Fix one side of the wall jamb.

Line on the other side. Drill a pivot hole, then insert
wall anchor.

STEP

4

STEP

3

Fix both top and bottom frame to the side wall frame.

Insert another wall jamb into the side wall frame.

Frames raised

shall face outside.

Note:

The side

of the wall
frame with hole
shall face
inside.

Note:

1160390-T01-A

Summary of Contents for K-37469T

Page 1: ...installed prior to installing your shower door Prepare waterproof layer to wall and floor of the showering area It is not allowed for any presence of electric switches and sockets Make sure the floor drain runs smoothly Before starting the door installation lay out and identify all the parts Use the exploded view illustrated on page 3 for reference For the installation method of customized shower ...

Page 2: ...r the side panel is delivered to the door assembly Remove the panel wall channel before installing the door but do not remove the transit blocks Before installation check that all components are correctly supplied If any parts are missing please ring the helpline PARTS IDENTIFICATION PARTS IDENTIFICATION 1160390 T01 A ...

Page 3: ...ttom Pivot Caver Top Glass Shelf X1 Handle Assy Pivot Pin X2 4mm Allen Key 4mm X6 X10 X6 X2 Cover X6 Phillips Screwdriver Pencil Caulk Gun Measuring Tape Safety Glasses Center Punch Hammer Knife Masonry Drill 6mm Drilll Bit Level Drop Cloth Materials Required Tape Silicone Sealant Tools Required 6mm INSTALLATION REQUIREMENTS INSTALLATION REQUIREMENTS 1160390 T01 A ...

Page 4: ...x one side of the wall jamb Line on the other side Drill a pivot hole then insert wall anchor STEP 4 STEP 3 Fix both top and bottom frame to the side wall frame Insert another wall jamb into the side wall frame Frames raised shall face outside Note The side of the wall frame with hole shall face inside Note 1160390 T01 A ...

Page 5: ...crew then fix the wall jamb Please first insert the glass into the top frame and then into the bottom frame Please insert the glass in the correct direction the end with the hole shall be close to the top frame and the labeled side with arrows on the label shall be against the wall STEP 7 1160390 T01 A ...

Page 6: ...Lift the door into place Insert the pin into the base and then insert the glass door IMPORTANT Ensure the door is fully supported at all times Note Please make sure that there should be inserts with correct directions at both these two places 1160390 T01 A ...

Page 7: ...e base and the body Then tighten the glass and the pivot pin assembly Note The pivot pin assembly should be vertical after being tightened STEP 13 STEP 12 Push the wall frames at both sides to make the gap even between the glass and the top and bottom frames Install the handle 1160390 T01 A ...

Page 8: ... STEP 15 Install the base of the glass bracket Note Ensure the accessory is positioned in a horizontal way 6mm Note Ensure the accessory is positioned in a horizontal way STEP 16 Line then fix the bracket base STEP 17 Fix the glass bracket 1160390 T01 A ...

Page 9: ...s and the top frame Then insert the side seal into the wall frame STEP 18 Fix the magnetic strips onto the door glass and the side panel When the door is closed the magnetic strips should touch along their length STEP 21 Insert the cover seal to the top frame 9 1160390 T01 A ...

Page 10: ...l onto the door glass Insert the cover seal to the wall frame STEP 23 Insert the bottom seal to the door glass STEP 24 Install the pivot pin and other cover caps STEP 25 Install the frame cap of top and bottom frame 1160390 T01 A ...

Page 11: ...STEP 26 Lay a thin bead of sealant between the wall channel and the bottom frame 11 STEP 27 Do not use the enclosure for at least 24 hours 24 24hrs 1160390 T01 A ...

Reviews: