4. Back-to-Back Valve Installation
Install both valves following the valve installation instructions.
The supplies to one of the valves will be reversed.
Remove the plaster guard, cap, cap assembly, and collar from the
valve with the reversed supply connections.
Rotate the cap assembly and collar 180° (tab on bottom).
Reassemble and securely tighten the screws on the cap assembly.
Reinstall the plaster guard.
Hot Supply
1" Copper Tube
Plaster Guard
Screws
Cap
Assembly
Cold Supply
1" Copper Tube
This feature faces downward
for back-to-back installation.
180˚
Kohler Co.
7
1205550-2-C