Kohler K-22489T-G-0 Installation And Homeowners Manual Download Page 4

-3-

WIRING DIAGRAM

CTR

LIN

FAN

NOUT

HOT

NIN

LIGHT

A4

A3

A2

A1

12V

STEPPER MOTOR

BLUE

RED

PINK

YELLOW

ORANGE

HEATER

THERMOSTAT

THERMAL FUSE

OVER CURRENT FUSE

MOTOR

CAPACITOR

ALL-POLE SWITCH (OPTIONAL)

220V
50Hz

THE RATE OF THE

POWER SWITCH

MUST NOT BE LOWER THAN 250V

16A

250V

16A

RED

RED

BLUE

BLUE

BLUE

BROWN

YELLOW

YELLOW

YELLOW

YELLOW/GREEN

/

2

1

+

+

+

+

+

+

There's no risk of damage to the insulation of power cord.
Copper cord must be inserted into the pillar terminal hole, and make
sure all the cords under the terminal are inserted into the pillar
terminal completely.
Suggest using a power cord which with specification 60227 IEC 53
Model's powercord Specified in GB/T 5023.5 and with cross section
of 3X1.0mm .

,

GB/T 5023.5

60227 IEC 53

,

3X1.0mm

2

2

Terminal

Conductor

Insulation

8

(Unit: mm)
(

:

)

WARNING

Make sure the power cord installed firmly,

otherwise it may catch fire.

Conductor

Conductor

Earth

Power Cord

8

8

8

13

15

10

Wall Controller

Signal Line

1369765-T01-A

Summary of Contents for K-22489T-G-0

Page 1: ...ion and Homeowners Guide Underscore Bathroom Heater S300GP S300GP K 22489T G 0 KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN ROAD JING AN DISTRICT SHANGHAI PRC POST CODE 200436 158 200436 1369...

Page 2: ...uct complies with GB 4706 1 2005 GB4706 23 2007 and GB 4706 27 2008 please leave instructions for the consumer GB 4706 1 2005 GB4706 23 2007 GB 4706 27 2008 WARNING Risk of electrical shock WARNING Ri...

Page 3: ...4 Wall Controller IPX4 K 22489T G 0 K 22489T G 0 SIMPLIFIED DIAGRAM OF THE UNIT Note Plaster or other ceiling opening dimension 275 X 275 mm 275 X 275 mm 5 0 5 0 5 0 5 0 BTP4 8 Triangular Self Tapping...

Page 4: ...he insulation of power cord Copper cord must be inserted into the pillar terminal hole and make sure all the cords under the terminal are inserted into the pillar terminal completely Suggest using a p...

Page 5: ...e bathroom heater by a ventilation outlet assembly and then fix it with a clamp 3 Make a Mounting Hole Fix the position to install the bathroom heater and then drill a 275 275 hole with an install tem...

Page 6: ...130mm 1800mm Expansion Pipe M6 Screw Rod M6 M6 Butterfly Nut M6 M6 Washer M6 M6 Spring Washer M6 M6 Nut M6 Hanger Triangular Self tapping Screw BTP4 10 Ventilation Outlet ST4 2 10 Self Tapping Screw S...

Page 7: ...kg in load for batten installing method 200mm 200mm 300mm 1000mm M6 25 Air Exhaust Pipe Wall Lower than 1000mm 1000 300mm above 300 300mm above 300 Air Outlet Window Bathroom Heater 1 Installation of...

Page 8: ...tch hinge and push the other end next Demount the decorative screw case from the base M4 M6 Butterfly Nut M6 6 Washer 6 6 Spring Washer 6 M6 Nut M6 Plasterboard Ceiling Plasterboard Ceiling Attach Han...

Page 9: ...t Ventilation Outlet Hook Step Six Use 4 BTP4 10 triangular self tapping screws to lock the machine and mounting hanger Use one ST4 2 10 self tapping screw to fix the machine and ventilation outlet as...

Page 10: ...rboard Ceiling Ventilation Outlet Assembly Batten Batten Plasterboard Ceiling Batten Step Two Fix two hangers on the batten with M4 cross countersunk head self tapping screws Shown as the figures belo...

Page 11: ...r body Put the hanger inside the flanged sinking groove of the body Power Cord Mounting Hole Ventilation Outlet Assembly Plasterboard Ceiling Plasterboard Ceiling Push Into The Install Hole Flanged Si...

Page 12: ...o the position of the labelled boom fix the M6 screw rod on the cerement board and attach the hanger to the M6 screw rod The hanger is required to flatten the plasterboard shown as the figures M6 M6 I...

Page 13: ...nd mounting hanger Step Five Take down the wiring cover plate Insert the power cord and 2 signal lines into the wire terminals Tighten the terminal screws and fix the lines Finally mount the wiring co...

Page 14: ...p Three to fix the panel and machine Installation Finished M6 ST4 2 10 1 M4 10 ST4 2 10 Self tapping Screw One ST4 2 10 1 M4 10 Screw Two M4 10 WALL CONTROLLER INSTALLATION Fix the wall controller fra...

Page 15: ...controller break down A Power failure D The signal line route is interrupted B Disconnected power cord A The pilot lamp does not turn on C Circuit breaker is off B Fail to control the bathroom heater...

Page 16: ...without help Please remember that the checking and repairs done by users themselves could easily cause damage to the machine or cause physical harm to the person 1 220V 2 3 4 5 6 1 2 3 4 5 6 7 8 9 1...

Reviews: