-10-

Step Four:
Take down the wiring cover plate. Insert the power cord
and 2 signal lines into the wire terminals. Tighten the
terminal screws and fix the lines. Finally, mount the wiring
cover plate.

3

2

Power Cord

Terminal

Wire Box Cover

L

N

Signal Line

Step Five:
Put the ventilation outlet assembly onto the plasterboard
celling, and push the machine into the install hole. Hang
the ventilation outlet hook over the rut inside the bathroom
heater body. Put the hanger inside the flanged sinking
groove of the body.

Power Cord

Mounting Hole

Ventilation Outlet Assembly

Plasterboard Ceiling

Plasterboard Ceiling

Push Into The Install Hole

Flanged Sinking Groove

Hanger

Machine

Rut

Ventilation Outlet Hook

Step Six:
Use 4 BTP4*10 triangular self-tapping screws to lock the
body and the hanger. Use one ST4.2*10 self-tapping screw
to fix the machine and ventilation outlet assembly. Next,
cover the decorative screw case.

BTP4*10

(4

)

ST4.2*10

(1

)

Decorative Screw Case

Decorative
Screw Case

BTP4*10 Triangular
Self-tapping Screw(Four)
BTP4*10

(4

)

ST4.2*10
Self-tapping
Screw(One)
ST4.2*10

(1

)

1369765-T01-A

Summary of Contents for K-22489T-G-0

Page 1: ...ion and Homeowners Guide Underscore Bathroom Heater S300GP S300GP K 22489T G 0 KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN ROAD JING AN DISTRICT SHANGHAI PRC POST CODE 200436 158 200436 1369...

Page 2: ...uct complies with GB 4706 1 2005 GB4706 23 2007 and GB 4706 27 2008 please leave instructions for the consumer GB 4706 1 2005 GB4706 23 2007 GB 4706 27 2008 WARNING Risk of electrical shock WARNING Ri...

Page 3: ...4 Wall Controller IPX4 K 22489T G 0 K 22489T G 0 SIMPLIFIED DIAGRAM OF THE UNIT Note Plaster or other ceiling opening dimension 275 X 275 mm 275 X 275 mm 5 0 5 0 5 0 5 0 BTP4 8 Triangular Self Tapping...

Page 4: ...he insulation of power cord Copper cord must be inserted into the pillar terminal hole and make sure all the cords under the terminal are inserted into the pillar terminal completely Suggest using a p...

Page 5: ...e bathroom heater by a ventilation outlet assembly and then fix it with a clamp 3 Make a Mounting Hole Fix the position to install the bathroom heater and then drill a 275 275 hole with an install tem...

Page 6: ...130mm 1800mm Expansion Pipe M6 Screw Rod M6 M6 Butterfly Nut M6 M6 Washer M6 M6 Spring Washer M6 M6 Nut M6 Hanger Triangular Self tapping Screw BTP4 10 Ventilation Outlet ST4 2 10 Self Tapping Screw S...

Page 7: ...kg in load for batten installing method 200mm 200mm 300mm 1000mm M6 25 Air Exhaust Pipe Wall Lower than 1000mm 1000 300mm above 300 300mm above 300 Air Outlet Window Bathroom Heater 1 Installation of...

Page 8: ...tch hinge and push the other end next Demount the decorative screw case from the base M4 M6 Butterfly Nut M6 6 Washer 6 6 Spring Washer 6 M6 Nut M6 Plasterboard Ceiling Plasterboard Ceiling Attach Han...

Page 9: ...t Ventilation Outlet Hook Step Six Use 4 BTP4 10 triangular self tapping screws to lock the machine and mounting hanger Use one ST4 2 10 self tapping screw to fix the machine and ventilation outlet as...

Page 10: ...rboard Ceiling Ventilation Outlet Assembly Batten Batten Plasterboard Ceiling Batten Step Two Fix two hangers on the batten with M4 cross countersunk head self tapping screws Shown as the figures belo...

Page 11: ...r body Put the hanger inside the flanged sinking groove of the body Power Cord Mounting Hole Ventilation Outlet Assembly Plasterboard Ceiling Plasterboard Ceiling Push Into The Install Hole Flanged Si...

Page 12: ...o the position of the labelled boom fix the M6 screw rod on the cerement board and attach the hanger to the M6 screw rod The hanger is required to flatten the plasterboard shown as the figures M6 M6 I...

Page 13: ...nd mounting hanger Step Five Take down the wiring cover plate Insert the power cord and 2 signal lines into the wire terminals Tighten the terminal screws and fix the lines Finally mount the wiring co...

Page 14: ...p Three to fix the panel and machine Installation Finished M6 ST4 2 10 1 M4 10 ST4 2 10 Self tapping Screw One ST4 2 10 1 M4 10 Screw Two M4 10 WALL CONTROLLER INSTALLATION Fix the wall controller fra...

Page 15: ...controller break down A Power failure D The signal line route is interrupted B Disconnected power cord A The pilot lamp does not turn on C Circuit breaker is off B Fail to control the bathroom heater...

Page 16: ...without help Please remember that the checking and repairs done by users themselves could easily cause damage to the machine or cause physical harm to the person 1 220V 2 3 4 5 6 1 2 3 4 5 6 7 8 9 1...