-4-
+
+
+
+
+
+
There's no risk of damage to the insulation of power cord.
Copper cord must be inserted into the pillar terminal hole, and make
sure all the cords under the terminal are inserted into the pillar
terminal completely.
Suggest using a power cord which with specification 60227 IEC 53
Model's powercord Specified in GB/T 5023.5 and with cross section
of 3X1.0mm .
,
GB/T 5023.5
60227 IEC 53
,
3X1.0mm
2
2
Terminal
Conductor
Insulation
8
(Unit: mm)
(
:
)
WARNING
Make sure the power cord installed firmly,
otherwise it may catch fire.
Conductor
Earth
Power Cord
8
8
13
10
PREPARATIONS BEFORE INSTALLATION
A. Preparation before the installation
A.
1. Open the hole of outlet window
Make sure that the outlet window
s position (it should be
lower than the outlet of the bathroom heater to prevent the
water come back to the bathroom heater from the outlet
window), and open a round hole on the wall.
2. Outlet window installation
Fix the air exhaust pipe to the outlet window on the wall
with the clamp as the preparation of bathroom heater
installation. Seal the pipe and the outlet window with
foaming agent.
1.
(
)
2.
Ceiling
Air Exhaust Pipe
Wall
Inside
Outside
Outlet Window
The situation of outlet window on the
wall outside.
The situation of outlet window on the
wall inside.
Outlet Window
Outlet Window
Hole on the Wall
Hole on the Wall
120mm
120mm
110mm
110mm
1367689-T01-A