background image

-3-

+

+

+

+

+

+

There's no risk of damage to the insulation of power cord.
Copper cord must be inserted into the pillar terminal hole, and make
sure all the cords under the terminal are inserted into the pillar
terminal completely.
Suggest using a power cord which with specification 60227 IEC 53
Model's powercord Specified in GB/T 5023.5 and with cross section
of 3X1.5mm .

,

GB/T 5023.5

60227 IEC 53

,

3X1.5mm

2

2

Terminal

Conductor

Insulation

8

(Unit: mm)
(

:

)

WARNING

Make sure the power cord installed firmly,

otherwise it may catch fire.

Conductor

Earth

Power Cord

8

8

13

10

K-21465T-G-0

K-21463T-XG-0

MAIN

CONTROL

CIRCUIT

BOARD

ALL-POLE SWITCH (OPTIONAL)

220V
50Hz

THE RATE OF THE

POWER SWITCH

MUST NOT BE LOWER THAN 250V

20A

250V

20A

HOT MOTOR

VENT MOTOR

YELLOW/GREEN

/

HEATER 1

1

HEATER 2

2

THERMOSTAT

THERMAL FUSE

OVER CURRENT FUSE

CAPACITOR

CAPACITOR

CN4

P5

P4

P3

P2

P1

CN7

CN8

CN5

CN12

CN6

CN3

CN2

CN11

CN14

STEPPER MOTOR

STEPPER MOTOR

RED

BLUE

BLUE

BLUE

BLUE

BLUE

BLUE

RED

RED

RED

RED

BLACK

WHITE

WHITE

WHITE

BROWN

BROWN

GRAY

GRAY

PINK

PINK

YELLOW

YELLOW

ORANGE

ORANGE

LED POWER

LED

MAIN

CONTROL

CIRCUIT

BOARD

ALL-POLE SWITCH (OPTIONAL)

220V
50Hz

THE RATE OF THE

POWER SWITCH

MUST NOT BE LOWER THAN 250V

20A

250V

20A

HOT MOTOR

VENT MOTOR

YELLOW/GREEN

/

HEATER 1

1

HEATER 2

2

THERMOSTAT

THERMAL FUSE

OVER CURRENT FUSE

CAPACITOR

CAPACITOR

CN4

P5

P4

P3

P2

P1

CN7

CN8

CN5

CN12

CN6

CN3

CN2

CN11

CN14

TEMPERATURE

AND HUMIDITY

SENSOR MODULE

ANION GENERATOR

STEPPER MOTOR

STEPPER MOTOR

RED

BLUE

BLUE

BLUE

BLUE

BLUE

BLUE

RED

RED

RED

RED

RED

RED

BLACK

BLACK

WHITE

WHITE

WHITE

BROWN

BROWN

GRAY

GRAY

PINK

PINK

PINK

YELLOW

YELLOW

YELLOW

ORANGE

ORANGE

ORANGE

LED POWER

LED

CLOUD

COMMUNICATION

ASSEMBLY

RED

WHITE
WHITE
WHITE
WHITE

1373009-T01-A

Summary of Contents for K-21463T-G-0

Page 1: ...rs Guide Veil Bathroom Heater S600G S600G K 21463T G 0 Aircare K 21463T XG 0 Cloud K 21465T G 0 KOHLER CHINA INVESTMENT CO LTD NO 158 JIANG CHANG SAN ROAD JING AN DISTRICT SHANGHAI PRC POST CODE 200436 158 200436 1373009 T01 A ...

Page 2: ...GB4706 23 2007 GB 4706 27 2008 GB7000 1 GB7000 202 and GB T17743 please leave instructions for the consumer GB 4706 1 2005 GB4706 23 2007 GB 4706 27 2008 GB7000 1 GB7000 202 GB T17743 WARNING Risk of electrical shock WARNING Risk of electrical shock WARNING Risk of electrical shock A licensed electrician should make all electrical connections Connect only to a circuit protected by a typical two po...

Page 3: ...CUIT BOARD ALL POLE SWITCH OPTIONAL 220V 50Hz THE RATE OF THE POWER SWITCH MUST NOT BE LOWER THAN 250V 20A 250V 20A HOT MOTOR VENT MOTOR YELLOW GREEN HEATER 1 1 HEATER 2 2 THERMOSTAT THERMAL FUSE OVER CURRENT FUSE CAPACITOR CAPACITOR CN4 P5 P4 P3 P2 P1 CN7 CN8 CN5 CN12 CN6 CN3 CN2 CN11 CN14 TEMPERATURE AND HUMIDITY SENSOR MODULE ANION GENERATOR STEPPER MOTOR STEPPER MOTOR RED BLUE BLUE BLUE BLUE B...

Page 4: ... 1 HEATER 2 2 THERMOSTAT THERMAL FUSE OVER CURRENT FUSE CAPACITOR CAPACITOR CN4 P5 P4 P3 P2 P1 CN7 CN8 CN5 CN12 CN6 CN3 CN2 CN11 CN14 STEPPER MOTOR STEPPER MOTOR RED BLUE BLUE BLUE BLUE BLUE BLUE RED RED RED RED BLACK WHITE WHITE WHITE BROWN BROWN GRAY GRAY PINK PINK YELLOW YELLOW ORANGE ORANGE LED POWER LED MAIN CONTROL CIRCUIT BOARD ALL POLE SWITCH OPTIONAL 220V 50Hz THE RATE OF THE POWER SWITCH...

Page 5: ...the position of the bathroom heater and make the holes with the installation template Hole Size 275 mm 575 mm Bring the power cords and ventilation outlet assembly to the hole edge on the plasterboard The keels should not be placed on the edges of the installation holes to ensure that the ventilation outlet assembly could be installed correctly 5 0 5 0 Note 1 2 3 275 mm 575 mm 5 0 5 0 Ceiling Air ...

Page 6: ...t M6 6 Washer 6 6Spring Washer 6 M6 Nut M6 Note Initial Length 140mm Stretch Length 2000mm 140mm 2000mm 305mm C Packing List C Remote Control Only K 21465T G 0 K 21465T G 0 1373399 Ventilation Outlet Assy S600G S600G BTP4 8 Triangular Self Tapping Screw BTP4 8 Cover 2 M4 25 Screw 2 Base 6 Plastic Expansion Pipe 6 2 Remote Control Base Assy 1367443 Remote Control Assy Hanger Triangular Self tapping...

Page 7: ...ngth for the installation The distance between the product and the air outlet window shall be 2000mm or lower Cut the screw rod M6 to suit the distance between the ceiling and the roof 200mm 200mm 300mm 2000mm M6 Air Exhaust Pipe Wall Under 2000mm 2000mm Above 300mm 300mm Above 300mm 300mm Air Outlet Window Remote Control Only K 21463T G 0 K 21463T XG 0 K 21463T G 0 K 21463T XG 0 1373401 Installat...

Page 8: ...Ceiling Ventilation Outlet Assy Installation Hole Marked Hole 179 179 2 Plug the M6 screw rod on the cerement board and attach the hanger to the rod as the diagram shows Fix two wooden bars to the hanger with 8 ST 4 2 10 triangular screws 2 M6 M6 ST4 2 10 8pcs M6 Butterfly Nut M6 6 Washer 6 6 Spring Washer 6 M6 Nut M6 Hanger Clinging to Plasterboard Ventilation Outlet Assy Wooden Bar ST4 2 10 Tria...

Page 9: ...on the wiring terminal insert the power cord not supplied connected to the indoor fixed line into the wiring terminal tighten the wring terminal screw VI Fix the power cord with power cord clips The power cord clip must pin the insulation sheath of power cord VII Use the screw removed in step I to fix the wiring cover plate again 4 I II III IV V VI VII I Power Line Terminal Junction Box Cover Wire...

Page 10: ...ver Plasterboard Ceiling Plasterboard Panel Base Panel Base Clinging to Plasterboard BTP4 8 Triangular Self tapping Screw BTP4 8 2 Installing the Main Body Method 2 Ceiling mounting has not been installed 1 Positioning and installation of the suspenders 1 Mark the holes of screw rods on the cement board as the figure shows 2 1 1 90 180 Install Template Cement Board Marked Hole Marked Hole Marked H...

Page 11: ...s ST4 2 8 1pc 3 BTP4 8 8pcs 5pcs BTP4 8 Triangular Self Tapping Screw BTP4 8 4 4 Hang the bathroom heater on the ceiling with the screw rods and modify the levelness Finally tightening the screws 4 Hanger Decorative Screw Cover Decorative Screw Cover ST4 2 8 Self tapping Screws ST4 2 8 1 M6 Butterfly Nut M6 6 Washer 6 6 Spring Washer 6 M6 Nut M6 5 Fix the pipe and ventilation outlet assembly with ...

Page 12: ...e installation holder on the fixing hole Fixing the holder with screws and install it Installing the screw covers on the screws Placing the remote controller on the holder 6mm 45mm INSTALLATION OF REMOTE CONTROLLER HOLDER INSTALLATION OF REMOTE CONTROLLER HOLDER Remote Control Cover Screw Base Expansion Tube INSTALLATION OF COIN BATTERY INSTALLATION OF COIN BATTERY Please follow the installation d...

Page 13: ...he heater mode FAN Turn on the fan mode DRY Turn on the hot cool dry clothes mode VENTILATION Turn on the ventilation long time vent mode 24 AIR FLOW Set the air flow swing or fixed AIR CARE Turn on the air care mode LIGHT Lighting on and off chang the light color Light Off STOP Stop certain function Turning off the light D Display Information D Current Set Hour Minute Celsius Humidity HEATER FAN ...

Page 14: ...rotect the machine and the remote control will show the count down FAN the default time is 3 hours minimum time is 30 minutes and maximum time is 6 hours DRY the default time is 3 hours minimum time is 30 minutes and maximum time is 6 hours If press Stop when hot dry is working the heater will continue to work for next 30 seconds to protect the machine and the remote control will show the count do...

Page 15: ...priate position or angle C Circuit breaker is in the Off position C No wake up C Low battery A Wait until the power is restored A Please replace the battery A Make the pairing B Connect the power cord into the junction box of bathroom heater B Please install the battery correctly B Change the using position or angle to make the controller towards the bathroom heater C Turn on the power at the brea...

Page 16: ... taken 2 Please confirm no water penetration at the connection area of AC wire and the connection area is not easy to be affected by damp 3 The head AC power supply must be protected with appropriate fuse 4 Please confirm the AC power supply should be shut off before maintaining the products with AC power related 5 All electrical connection must be compliance with related regulation and codes 6 Al...

Reviews: