F. Fill bathtub with water to approximately 40 mm
above the jets and trial run pump for 10-15 minutes.
Check all the fittings for leaks and test the control
functions. Switch off the spa pump and leave the unit
filled with water (pump is not running) for at least
another two minutes. Check the pump and pipes union
connections for leaks. Hand tighten union connections
if required.
F.

40mm

10-15

(

)

2

UNION CONNECTIONS

E. Connect power supply (10 AMPS supply) to motor.
This should be a separate line, direct from the
switchboard and should be protected by an earth
leakage circuit breaker(RCD).
To make this unit "child proof" it is recommended to
connect the mains power supply using a PDL 681 VWP
Switch mounted beside the light switch. When spa is
idle this switch should be on OFF.
The electrical connections must comply with local
authority regulations and must be done by an
authorized electrician. Please refer to Spa Pump
Installation & Operation Instructions sheet.

E.

10

(RCD)

PDL681 VMP

IMPORTANT:

Your spa has been factory tested and

approved. It is the responsability of the installer to test
run the spa check all the fittings for leaks and test the
control functions.
NON OBSERVANCE WILL INVALIDATE FACTORY
WARRANTY.

1036303-T01-B

DIRLLING AND CUTTING ACRYLIC

DRILLING:

NOTE:

CUTTING:

Small holes can be drilled with a twist drill,

but the cutting edge MUST be backed off with an oil
stone (the sharp edge dulled). Large holes must be
drilled with a hole saw. Maximum drill size-12mm. Drill
speeds-6mm x 1800 RPM-12 mm x 900 RPM.

Always drill from acrylic surface.

If for any reason the acrylic requires cutting,

use a fine tooth hacksaw and proceed with caution.
Edges can be smoothed with a second-cut file and
medium-fine sandpaper. If the surface of the acrylic
should happen to be damaged, it can be restored by
polishing with an abrasive cleaner . Deep scratches
can be removed by rubbing with 600 grade wet & dry
sandpaper then polishing.

12mm

6mmx180

/

12mmx900

600

/

Summary of Contents for K-18778T

Page 1: ...iliarize yourself with the required tools materials and installation sequences Follow the sections that pertain to your particular installation This will help you avoid costly mistakes In addition to...

Page 2: ...uired A Tools Required B A Adjustable pipe wrench Rule Level Safety shoes Safety glasses Square Pliers Utility knife Plumbers putty Wall coverings as necessary Silicone sealant Gypsum ciment optional...

Page 3: ...allation The suggested framing construction is illustrated 1 16 2mm Gap Between Bath Rim and Framing 2 Bath Rim Framing Construction Finished Wall Wall D D Plumbing Preparation Position the plumbing a...

Page 4: ...carefully protect its surface during installation 2a 1305 700 1305 1 4 1 9 2b Whirlpool must be installed level on all top edges 2b IMPORTANT 1036303 T01 B 3 A 3 Fit timber batten supports or check in...

Page 5: ...Silicone Sealant Tiling Bead Brick Rebated Into Wall Ng Silicone Sealant 50 25mm Timber Batten Paste Mortar Tile Packed Out From Wall Paste Mortar Tile Brick Under Flange Tiling Ng Silicone Sealant T...

Page 6: ...ized electrician Please refer to Spa Pump Installation Operation Instructions sheet E 10 RCD PDL681 VMP IMPORTANT Your spa has been factory tested and approved It is the responsability of the installe...

Page 7: ...ers wire brushes or other metal tools One of the powder type detergents may be used on a damp cloth to provide mild abrasive action to the residual plaster A 2 Mequiars 28 A Consumer Responsibilities...

Page 8: ...r after purchase Implied warranties including that of merchantability and fitness for a particular purpose are expressly limited in duration to the duration of this warranty Kohler China disclaims any...

Reviews: