-6-
3. Drill four holes with diameter of 10mm and depth of 80mm
with churn drilling as shown.
A. Fill the bulge nail into the instruction hole on the wall, fix
the fixing frame to the bulge nail, adjust the gasket and
tighten the nut.
B. Fill the bulge nail into the instruction hole, fix the
adjustable bracket to the bulge nail, adjust the gasket
and tighten the nut.
3.
A
B
10mm
80mm
A.
B.
Adjustable Bracket
Mounting
Bracket
A
B
Bulge Screw
Bulge Screw
Gasket
Gasket
Nut
Nut
4. Tighten the nut with the wrench as shown in illustration A.
Tighten the nut with the wrench as shown in illustration B.
4.
A
B
A
B
Nut
Nut
Wrench
Wrench
B. Floor Discharge Installation Method
B.
1. Three discharge pipe installation methods based on actual
situation: A, B, C, adjust position by screw driver. Snap
discharge pipe lower end into discharge port.
1.
A
B
C
B
C
A
Discharge
Elbow
Discharge
Elbow
Discharge
Elbow
Water Tank
Bracket
Water Tank
Bracket
Water Tank
Bracket
Drain outlet
90mm, welding
90mm
Drain outlet
110mm
110mm
Drain outlet
110mm, welding
110mm
1263048-T01-C
Summary of Contents for HYDRO-TOWER 300
Page 18: ...18 A B A B 1263048 T01 C...