P4450
SPECIFICATION
Plumbing Connections
Hot (H) and Cold (C) inlets must be connected to the correct inlet supplies.
INSTALLATION
Before You Begin
1.
Turn off the water supply.
2.
The
plumbing
installation
must
comply
with
Water
Supply
Regulations/Bye-laws
(Scotland),
Building
Regulations
or
any
particular regulations and practices, specified by the local water
company or water undertakers. The installation should be carried out
by a plumber or contractor who is registered with, or is a member
of an association such as:
Institute of Plumbing (IOP), throughout the UK.
National Association of Plumbing, Heating and Mechanical Services
Contractors (NAPH & MSC), England and Wales.
Scottish and Northern Ireland Plumbing Employers’ Federation
(SNIPEF), Scotland and Northern Ireland.
3.
Before installation carefully inspect the new fixture for any signs of
damage.
1037045
5