7. Prepare the Locker Unit
Run two pieces of duct tape across the front of the locker unit, pulling the sides in until the center
of the locker unit is at the dimensions shown above.
Test the shelf fit in the set of grooves just above and below the taped areas of the locker unit.
Ensure the shelf fits tight. If the fit of the shelf is loose, tighten the tape across the locker unit until a
snug fit is achieved.
Leave the tape in place until the final step of the installation.
TIP:
Urethane based adhesive may be more effective for locker unit adhesion.
Generously apply bath and shower construction adhesive or silicone adhesive to the back of the
locker unit on the top, bottom, and sides.
9" (229 mm)
Locker
14-1/2" (368 mm)
Locker
10-7/8"
(276 mm)
16-13/16"
(427 mm)
Duct
Tape
1248925-2-C
12
Kohler Co.
Summary of Contents for 97631-G9
Page 65: ...1248925 2 C...
Page 66: ...1248925 2 C...
Page 67: ...1248925 2 C...
Page 68: ...USA Canada 1 800 4KOHLER M xico 001 800 456 4537 kohler com 2015 Kohler Co 1248925 2 C...