background image

   

                                                                               

1299768-AN2-A                                     

                                                                                                            2   

  

SERVICE PARTS

INSTALLATION

1

3

1

2

3

The finished wall

51~61

1119280

1119281

1304918

73089

834851

**Color code must be specified when ordering.

Do not take off the protectors(1) at this moment.

Connect the G1/2" water supply pipes(2) to the supply yoke(3). 

The distance from centerline of the water supplies to the surface of the finished wall must be between 51mm 

and 61mm. Make sure the left supply pipe is the hot supply and connected to the end with red mark.

Reviews: