3. Prepare the Bath
IMPORTANT!
Do not remove the bath feet or levelers from the bath.
Position the bath upside down on saw horses.
Remove and retain the screw from each corner of the bath shell.
Lift the shroud off the bath shell and set it aside.
IMPORTANT!
For installation on a concrete floor, clearance for the drain assembly must be provided.
Refer to the template provided with the bath.
Install the bath drain to the bath according to the instructions included with the drain.
Remove the tape from the four foot clips. Make sure the locking plates are in the locked position
and are oriented toward the outside of the bath as illustrated.
Screw
x4
Shroud
Saw Horse
Bath
Locked
Position
Foot Clip
Tape
Kohler Co.
7
1220597-2-C