Continue for all models
Whilst the fire box is still in position, decide which side the gas supply is to enter
the fire from. If concealed pipe work is required plan the pipe run to enter the fire
box through one of the openings in the sides of the fire box below the fuelbed
support panel and connect to the isolating / inlet elbow. The gas connection to the
appliance should be made to the isolating / inlet elbow using 8mm rigid tubing.
There must be no soldered joints within the firebox. See figure 8 & 9 below for
suggested concealed pipe layouts.
Fig. 8
Fig. 9
Note : Before breaking into the gas supply a tightness test should be carried
out to establish that the existing pipework is sound.
Carefully withdraw the fire box from the opening to enable the gas supply and fire
fixing to be completed.
IMPORTANT : THE 45MM GROMMET SUPPLIED IN THE LOOSE ITEMS MUST BE USED
TO SEAL THE GAS INLET POINT UTILISED ON THE FIREBOX. FAILURE TO SEAL
THIS INLET POINT COULD RESULT IN FLAME REVERSAL AND DAMAGE TO THE
CONTROLS ON THE FIRE. BFM EUROPE ACCEPT NO RESPONSIBILITY FOR
DAMAGE TO THE FIRE AS A RESULT OF FAILURE TO FOLLOW THIS REQUIREMENT.
14
Firebox
Fireplace
Builders
Opening
Gas Supply
Firebox
Approx.
40mm
Fireplace
Gas Supply
Approx.
40mm
Builders
Opening