FRAME SETUP INSTRUCTIONS 
 

IMPORTANT NOTE: Do not tighten any bolts until tower is fully assembled. 
 
The setup of this tower will go much quicker and more organized if you do some pre-assembly. 
The entire cross bar supports can be bolted together as per Figure 1. Also, the multi-strut 
systems can be bolted together. The section you opt to end at finishes with the ground stake 
clamps (item 4). These will be bolted to the last two holes of the bottom legs used. See Figure 3 
next page for more details. 
 
NOW TO BEGIN ASSEMBLY... 
 

A) 

Begin the tower at the very top. Take all three top portion tower legs (ITEM S1) and fasten 
them to the plastic tower top (ITEM 1) with twenty-four 5/16” self-tapping screws (ITEM 3). 
Tighten all of these screws.  DO NOT OVER TIGHTEN AS THESE SCREWS CAN STRIP IN 
PLASTIC. 

 

Note: These screws are all you should tighten until the tower is complete. 

 

B) 

After these legs are fastened, install the top portion struts (ITEMS S21, and S22). These are 
to be mounted with the flat side of step against the inside of the tower leg. 

 

C) 

Hold the next set of 48” tower legs (ITEM S2) to the back of the first set of legs. You also 
have to hold up a 23” brace (ITEM S31) to the back of the legs and run a 1/4” x 3/4” bolt 
through the top hole of all three items. (Don’t put the bolt through the bottom hole yet as the 
cross bar supports will have to be added.) 

 

D) 

After all three 23” struts are in place put a bolt through the top hole of the 19” support bars 
(ITEM S42) and bolt it to the bottom hole of the top tower leg (ITEM S1). 

 

E) 

The next step involves assembling several parts at the same time. You have to run a bolt 
through a 33 3/4” cross bar support (ITEM S45), the top hole of the second and third level of 
48” legs, and finally the 41” strut (ITEM S33). On the other side of the leg instead of the 33 
3/4" cross bar supports you need to bolt in the cross bar tensioner (ITEM 2) and the 29 1/2" 
cross bar (ITEM S44). 

 

Note: Make sure that only one cross bar tensioner ends up in each corner. 
Note: Make sure that 5/16” x 1/2” inch nuts and bolts are used to secure center of all cross 
bar supports. 

 

F) 

The next cross bar assembly consists of two 27 1/4" cross bars (ITEM S43), one 38 1/2” 
cross bar (ITEM S47), one 33 3/4" cross bar (ITEM S45), and a cross bar tensioner (ITEM 2). 
Bolt the two 27 1/4" pieces to the bottom holes of the second level legs. Bolt the 38 1/2" piece 
and the 33 3/4" with the tensioner to the top hole at the bottom of the third level legs. You 
stop at the 12’ section bolt on the two 32” struts (ITEM S32) between each leg. Bolt on the 
ground stake clamps and you’re done. If you’re building the 20’ assembly please read on. 

 

G) 

Before you bolt on the 32” struts, add another 48” leg in between them and the third level leg. 
A 35 1/4" cross bar support (ITEM S46) will also have to be added to the outside of these 
holes. 

 

H) 

Repeat steps A-F to complete the 20’ assembly using Figure 1 to find correct part placement. 

 

I) 

Tighten all nuts and bolts. 

 

Summary of Contents for Superior Windmill

Page 1: ...the blades are in motion The head can turn without warning and is very dangerous Use a ladder to climb the tower that is properly and safely secured DO NOT use the tower members as steps as they cann...

Page 2: ...STRUT S31 3 3 22 3 4 STRUT S32 6 32 STRUT S33 3 12 41 1 4 STRUT S41 6 15 3 4 CROSS BAR SUPPORTS S42 6 19 CROSS BAR SUPPORTS S43 6 27 1 4 CROSS BAR SUPPORTS S44 3 29 1 2 CROSS BAR SUPPORTS S45 6 3 33 3...

Page 3: ...6 6 CROSS BAR TENSIONER 3 24 5 16 SELF TAPPING SCREWS 4 6 GROUND STAKE CLAMPS 5 3 GROUND STAKE 6 1 SINGLE DIAPHRAM COMPRESSOR UNIT OR DOUBLE DIAPHRAM COMPRESSOR UNIT 7 1 PIVOT POST 8 1 RIM WASHER AND...

Page 4: ...4...

Page 5: ...three 23 struts are in place put a bolt through the top hole of the 19 support bars ITEM S42 and bolt it to the bottom hole of the top tower leg ITEM S1 E The next step involves assembling several pa...

Page 6: ...USE THE WINDMILL TO FALL HEAD UNIT ASSEMBLY AND SETUP INSTRUCTIONS J Lay down the hub assembly ITEM 14 in an area large enough for entire fan assembly K Attach fan blades ITEM 11 by lining up the thre...

Page 7: ...er top ITEM 1 Slide the rim washer then the bearing ITEM 8 onto the pivot post Grease the bearing then slide into the plastic tower top Note The pivot post should be greased before installation and on...

Page 8: ...attach that end of the hose to the air diffuser To prevent stirring up mud we recommend that you place the stone inside a plastic pail or bucket Gravel or stones should be placed in the pail to ensure...

Page 9: ...cts to another port in the T Joint assembly After this is done you can run a hose from the last opening in the T Joint assembly to the body of water Refer to Steps V or W for further instructions The...

Page 10: ...Blade Braces 12 4 Nuts Bolts Packages 1 2 2 TOWER 12 A PKG ITEMS QTY 1 Top Portion Short Strut S21 3 2 Top Portion Long Strut S22 3 3 Strut 22 S31 3 4 Strut 32 S32 3 5 Strut 41 S33 3 6 Tail Arms 2 7...

Page 11: ...1 Tower Legs 48 S2 3 2 Strut 22 S31 3 3 Strut 41 S33 6 4 Cross Bar Supports 15 3 4 S41 6 5 Cross Bar Supports 33 3 4 S45 3 6 Cross Bar Supports 38 1 2 S47 3 7 Cross Bar Supports 43 1 4 S49 6 8 90 Tigh...

Page 12: ...16 NUTS FOR CROSS BAR SUPPORTS CENTERS 18 8 1 4 1 2 BOLTS TOWER GROUND STAKE CLAMPS 18 9 1 4 NUTS TOWER GROUND STAKE CLAMPS 18 Package 3 Included with 20 Foot Tower Only SIZE NOTE QTY 1 1 4 2 3 4 EYE...

Page 13: ...CENTERS LOWER SECTION 3 8 5 16 1 2 BOLT FOR S41 S45 S47 6 9 5 16 NUTS FOR S41 S45 S47 6 10 1 4 1 2 BOLT FOR S31 S33 24 11 1 4 NUTS FOR S31 S33 24 12 1 4 1 2 BOLT FOR HOSE CLIP 1 13 1 4 NUT FOR HOSE C...